My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 SW EVERETT MALL WAY NOVEL EYES 2024-06-12
>
Address Records
>
SW EVERETT MALL WAY
>
15
>
NOVEL EYES
>
15 SW EVERETT MALL WAY NOVEL EYES 2024-06-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 12:51:20 PM
Creation date
4/12/2024 10:09:44 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
15
Tenant Name
NOVEL EYES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br /> WAC 29646B=900 : ELECTRICAL PLAN REVIEW <br /> WASHINGTON <br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required. Then select the box next to (a) <br /> to tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-4613-900. If plan review <br /> is required, select the box next to (b) and (c) to acknowledge that plan review is required and the electrical plans have been <br /> provided with this permit application. <br /> * If item (a)-(ii, iii, or v) is selected, the work must also comply with section (a)-(vii). See arrow flow chart below. <br /> (3) Electrical plan review. <br /> F#/J (a) Electrical plan review is not required for: <br /> 0 (i) Low voltage systems; <br /> �❑ (ii) Lighting specific projects that result in an electrical load reduction on each feeder involved in the project; <br /> �----� (iii) Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder <br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder. <br /> (iv) Stand-alone utility fed services that do not exceed 250 volts, 400 amperes where the project's distribution <br /> system does not include: <br /> (A) Emergency systems other than listed unit equipment per NEC 700. 12(F); <br /> (B) An essential electrical system defined in NEC 517.2; or <br /> (C) A required fire pump system. <br /> [] (v) Modifications to existing electrical installations where all of the following conditions are met: <br /> (A) Service or distribution equipment involved is rated not more than 400 amperes and does not exceed <br /> 250 volts or for lighting circuits not exceeding 277 volts to ground, <br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700. 12(F); <br /> (C) Does not involve branch circuits or feeders of an essential electrical system as defined in NEC <br /> 517.2; and <br /> (D) Service or feeder load calculations are increased by 5% or less. <br /> (vi) Electric power production source(s) such as solar photovoltaic, fuel cell, or wind electric system(s) with a total <br /> rating of 9600 watts or less. <br /> (vii) For installations in (a)(ii), (iii), and (v) of this subsection to be considered, the following must be <br /> available to the electrical inspector before the work is initiated: <br /> (A) A clear and adequate description of the project's scope; <br /> (B) A load calculation(s); <br /> (C) What the load changes are, providing both before and after panel schedules as needed; and <br /> (D) Provide information showing that the service and feeder(s) supplying the panel(s) where the work is <br /> taking place has adequate capacity for any increased load and has code compliant overcurrent <br /> protection for that supply. <br /> NOTE: Electrical plan review is not required for "Medical, dental, and chiropractic clinic" of which is a clinic or <br /> ` [{ physicians' office where patients are not regularly kept as bed patients for twenty-four hours or more, per section <br /> (1 )(c)(xli). <br /> (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care <br /> occupancies defined In this chapter. <br /> (c) if a review is required, the electrical plan must be submitted for review and approval before the electrical work is begun. <br /> Table 900-1 <br /> Table 900-2 <br /> Health or Personal Care Facilities Educational acid Institutional Facilities, Places of Assembly, or otherFacllities <br /> Health or Personal Care Facility Plan Review <br /> "hype Required Educational, institutional, or Plan Review <br /> i-lo itai Other�he� Facility TypesRequire4 <br /> ~4u 'srngne unitor lertg-tern^ �Ye= Educational Yes <br /> care t.igtit Institutis nal <br /> Soardinq home ye3 <br /> kssisted living facility vee <br /> Privav= alcoholism ho;pita YeS Notes to Tabfes 900-1 and 9M2. <br /> rlvate psych atr c nosp.tal ye_, ` , A city, authorized to do electrical inspections <br /> 't4atern ity home Ye_ may require plan review on facihW types not <br /> Arnbu ator,, surgery facility Yes reviewed by the department. <br /> enai her--)1=iia'ysi= clinic Yet <br /> Residen-U&I t`eatn<ent fa Cilli '3 YF= <br /> _nhanced _erg ice facility Yes <br /> Adult residential rehabilitation Yes PERMIT# Page 2-Plan Review <br /> center <br />
The URL can be used to link to this page
Your browser does not support the video tag.