My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell 4/16/2024
>
Contracts
>
6 Years Then Destroy
>
2025
>
Brown and Caldwell 4/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2025 3:58:28 PM
Creation date
4/17/2024 11:47:39 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell
Approval Date
4/16/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Jeff Marrs
Subject / Project Title
WFP eOM SharePoint Site & AM/Maintence Program Support
Tracking Number
0004299
Total Compensation
$230,774.76
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell 2/16/2025 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> 1 <br />Everett eOM and AM_Main Pgm Support SOW <br />City of Everett Contract No. XXXXXXXX <br />WFP eOM and AM/Maintenance Program Support Scope of Services <br />City of Everett – WFP eOM and AM/Maintenance Program Support <br />Project Understanding <br />The City of Everett (City) maintains and operates a Water Filtration Plant (WFP) and a Water Pollution <br />Control Facility (WPCF). In 2016 an electronic Operations and Maintenance (eOM) SharePoint site <br />was created for the WPCF. In the proceeding years, the WPCF plant staff have actively maintained <br />and frequently use the WPCF SharePoint site. The WFP does not have an equivalent eOM SharePoint <br />site; O&M documentation is maintained in traditional digital file folders. The City has asked Brown <br />and Caldwell (BC) to assist in the creation and development of the WFP eOM SharePoint site so both <br />facilities have similar O&M documentation accessibility, management, and training capability. <br />In 2021, BC reviewed the WFP’s existing O&M documentation and standard operating procedures <br />(SOPs) to identify gaps in the existing O&M information and develop recommendations for O&M <br />improvements and updates. In addition, this work included reviewing Washington State Department <br />of Health (DOH) guidelines for O&M manuals (DOH Publication 331-647) to identify regulatory <br />deficiencies in the current O&M documentation. BC focused this effort on reviewing operations O&M <br />information and did not review water quality, laboratory, or maintenance SOPs. Following the review <br />of the existing O&M information, BC developed recommended updates related to missing SOPs, <br />creating consistency across new and existing technical information, updating the format and <br />presentation of the O&M information, and changes needed to meet current DOH recommendations <br />for water treatment plant SOPs. During the development of the WFP eOM SharePoint site, BC will be <br />incorporating O&M documentation into the site. As the documentation is reviewed, it will present the <br />opportunity to update the 2021 Gap Assessment. BC will identify remaining gaps and determine <br />level of effort and necessary actions to address them. <br />Finally, the City identified the need to evaluate how data collection is used to inform asset <br />management and maintenance decision making. BC will conduct a review of the current approach <br />coupled with visioning for the desired future approach to data-informed asset management and <br />maintenance decision making. Based these two points, BC will develop a gap assessment and <br />proposed roadmap that aligns with best practices and outlines actions and timing to arrive at the <br />desired future state. <br />Scope of Work Summary and Work Breakdown Structure <br />The scope of work for the Project includes 4 Phases and 9 Tasks, which are identified in the <br />following table. <br /> <br /> <br />WFP eOM and AM/Maintenance Program Support Phases and Tasks <br />Phase No. Phase Name Task No. Task Name <br />Phase 100 Project Management - - <br />Phase 200 WFP eOM SharePoint <br />Task 201 Review Existing WPCF eOM Structure <br />Task 202 Configure WFP eOM Platform
The URL can be used to link to this page
Your browser does not support the video tag.