Laserfiche WebLink
<br />Schedule - GeoEngineers Standard - 2024 <br />Schedule of Charges – 2024 <br />COMPENSATION <br />Our compensation will be determined on the basis of time and expenses in accordance with the following schedule unless a <br />lump sum amount is so indicated in the proposal or services agreement. Current rates are: <br />Professional Staff <br />Staff 1 Scientist $ 146/hour <br />Staff 1 Engineer $ 154/hour <br />Staff 2 Scientist $ 167/hour <br />Staff 2 Engineer $ 175/hour <br />Staff 3 Scientist $ 191/hour <br />Staff 3 Engineer $ 198/hour <br />Project Scientist 1 $ 220/hour <br />Project Engineer 1 $ 228/hour <br />Project Scientist 2 $ 228/hour <br />Project Engineer 2 $ 234/hour <br />Senior Engineer/Scientist 1 $ 255/hour <br />Senior Engineer/Scientist 2 $ 279/hour <br />Associate $ 292/hour <br />Principal $ 320/hour <br />Senior Principal $ 340/hour <br />Technical Support Staff <br /> Administrator 1 $ 103/hour <br />Administrator 2 $ 119/hour <br />Administrator 3 $ 136/hour <br />CAD Technician $ 132/hour <br />CAD Designer $ 155/hour <br />Senior CAD Designer $ 180/hour <br />GIS Analyst $ 165/hour <br />Senior GIS Analyst $ 180/hour <br />GIS Coordinator $ 200/hour <br />*Technician $ 114/hour <br />*Senior Technician $ 136/hour <br />*Lead Technician $ 146/hour <br />Geotechnical Construction Specialist $ 191/hour <br />Environmental Database Manager $ 226/hour <br />Health and Safety Specialist $ 146/hour <br />Health and Safety Manager $ 200/hour <br /> <br />*Hours in excess of 8 hours in a day or 40 hours in a week will be charged at one and one-half times the hourly rates listed above. <br />Contracted professional and technical services will be charged at the applicable hourly rates listed above. Staff time spent providing <br />expert services in disputes, mediation, arbitration and litigation will be billed at one and one-half times the above rates. Time spent in <br />either local or inter-city travel, when travel is in the interest of this contract, will be charged in accordance with the foregoing schedule. <br />A surcharge may be applied to night and weekend work. See proposal for details. <br />Rates for data storage and web-based access will be provided on a project-specific basis. <br />Associated Project Costs (APC) <br />Associated Project Costs (APC) equal to six percent (6%) of professional fees will be assessed. This fee allows GeoEngineers to invest <br />in the necessary infrastructure to ensure we provide our clients with the latest technological and data security standar ds. The <br />investments include maintaining and advancing technical tools and platforms across all aspects of our business, and strengthe ning <br />our defenses against cyber threats to ensure data remains secure. These costs are not included in our hourly rates o r direct expenses.