My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Krazan & Associates, Inc. 4/17/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Krazan & Associates, Inc. 4/17/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 12:00:22 PM
Creation date
4/17/2024 11:59:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Krazan & Associates, Inc.
Approval Date
4/17/2024
End Date
12/31/2024
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Geotechnical exploration and engineering for Water Main Replacement “X”
Tracking Number
0004304
Total Compensation
$27,751.30
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br /> <br /> <br />PROFESSIONAL SERVICES AGREEMENT <br /> <br />This Professional Services Agreement (“Agreement”) is effective as of the date of last <br />signature below and is between the City of Everett, a Washington municipal corporation (the <br />“City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). This <br />Agreement is for the purpose of the Service Provider providing services to the City as set forth in <br />the Agreement. This Agreement includes and incorporates the Basic Provisions, the attached <br />General Provisions, the attached scope of work (Exhibit A), and the attached method of <br />compensation (Exhibit B). <br />BASIC PROVISIONS <br />Service Provider <br />Krazan & Associates, Inc. <br />4303 198th Street SW <br />Lynnwood, WA 98036 <br />Michael Rundquist (MichaelRundquist@krazan.com) <br />City Project <br />Manager <br />Candice Au-Yeung <br />City of Everett – Public Works <br /> <br />3200 Cedar Street <br />Everett, WA 98201 <br />cauyeung@everettwa.gov <br />Brief Summary of <br />Scope of Work <br />Geotechnical exploration and engineering for Water Main <br />Replacement “X” <br />Completion Date December 31, 2024 <br />Maximum <br />Compensation <br />Amount <br />$27,751.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.