My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2520 VICTOR PL 2024-06-13
>
Address Records
>
VICTOR PL
>
2520
>
2520 VICTOR PL 2024-06-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 9:28:47 AM
Creation date
4/19/2024 2:15:25 PM
Metadata
Fields
Template:
Address Document
Street Name
VICTOR PL
Street Number
2520
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' E2011-013 Description:Wiring bathrrom and bedroom in dormer addition to <br /> home. <br /> Applied: 11/3/2020 Approved: 11/4/2020 Site Address: 2520 VICTOR PL <br /> Issued: 11/4/2020 Finaled: 10/26/2021 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant: Dan Bauer <br /> Parent Permit: C1012-013 Owner: BAUER DANIEL K&RACHEL VITOUS <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> Adding a bathrrom and bedroom in dormer addition to home. <br /> Wiring bathrrom and bedroom in dormer addition to home. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 11/6/2020 11/6/2020 ELEC 06-ROUGH IN MIKE BEARDA CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 11/4/2020 3:23 PM Dan Bauer <br /> Contact Name:Dan Bauer <br /> Site Address:2520 VICTOR PL <br /> Phone:4252598708 <br /> e-Mail:danubus@gmail.com <br /> (11/6/2020 3:44 PM MCB) <br /> Make up grounds for rough in <br /> 11/9/2020 11/9/2020 ELEC 06-ROUGH IN STEVE BANKS APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 11/6/2020 2:41 PM Dan Bauer <br /> Contact Name:Dan Bauer <br /> Site Address:2520 VICTOR PL <br /> Phone:4252598708 <br /> e-Mail:danubus@gmail.com <br /> (11/9/2020 4:39 PM SKB) <br /> Move junction boxes in the attic up above insulation all four of them check at final check AFCI and GFCI at final. <br /> 5/12/2021 F5/12/2021 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> I <br /> Printed: Friday, 19 April,2024 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.