Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/14/2023 12/14/2023 ELEC 10-FINAL** MICHAEL NOT READY eTRAKiT Inspection Request <br /> WICKLANDER <br /> Notes: <br /> 12/11/2023 6:01 AM BRS FIELD OPS LLC(ELEC) <br /> Contact Name:BRS FIELD OPS LLC(ELEC) <br /> Site Address:6029 DEXTER AVE <br /> Phone:3852651237 <br /> e-Mail:permitting.department@blueravensolar.com <br /> 12/15/2023 12/15/2023 ELEC 05-SERVICE MICHAEL APPROVAL <br /> WICKLANDER <br /> Notes: <br /> 385-220-2160 <br /> NON-STANDARD@BLUERAVENSOLAR.COM <br /> Verify,primary grounding electrode?cold water bond at finalEnsure all conduit is firmly seated in the at each connection.90 going into the LB doesn't <br /> appear to be seated properly. <br /> 12/26/2023 12/26/2023 ELEC 10-FINAL** MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 12/19/2023 10:31 AM BRS FIELD OPS LLC(ELEC) <br /> Contact Name:BRS FIELD OPS LLC(ELEC) <br /> Site Address:6029 DEXTER AVE <br /> Phone:3852651237 <br /> e-Mail:permitting.department@blueravensolar.com <br /> Grounding,electrode,conductor,coming from the cold water must attach at the first overcurrent device parentheses service,which is the meter base. <br /> Currently,it's a number six going from the ground bar to the main service point.And if file cannot be completed until all the solar equipment is installed <br /> and ready to operate. <br /> 1/23/2024 1/23/2024 ELEC 10 FINAL** MICHAEL CORRECTIONWICKLANDER REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 1/19/2024 3:04 PM BRS FIELD OPS LLC(ELEC) <br /> Ted Matts will be onsite 3609204817 <br /> Contact Name:BRS FIELD OPS LLC(ELEC) <br /> Site Address:6029 DEXTER AVE <br /> Phone:3852651237 <br /> e-Mail:permitting.department@blueravensolar.com <br /> Reinstall 2 inch con from the meter to the panel the 90bO elbow to the LB is not seated.All PVC fittings must be firmly seated per NEC.. <br /> 2/27/2024 F2/27/2024 ELEC 10 FINAL** MIKE BEARDA APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 2/22/2024 2:02 PM BRS FIELD OPS LLC(ELEC) <br /> Levi Jennings 4253821938 will be onsite <br /> Contact Name:BRS FIELD OPS LLC(ELEC) <br /> Site Address:6029 DEXTER AVE <br /> Phone:3852651237 <br /> e-Mail:permitting.department@blueravensolar.com <br /> I <br /> Printed:Sunday,21 April,2024 2 of 2 <br /> SUPERION <br />