My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BEZOS ACADEMY 2024-08-07
>
Address Records
>
SMITH AVE
>
3201
>
BEZOS ACADEMY
>
3201 SMITH AVE BEZOS ACADEMY 2024-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 1:24:08 PM
Creation date
4/21/2024 12:47:31 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BEZOS ACADEMY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 5/26/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2205-024 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B2205-053 <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $65.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> CITY OF EVERETT STEPHANIE TUNG <br /> 3200 CEDAR ST <br /> EVERETT,WA,98201 <br /> PHONE: PHONE:2063409500 <br /> TAX PARCEL ID#:00439074401300 SITE ADDRESS:3201 SMITH AVE <br /> DESCRIPTION:SITE WORK FOR BEZOS ACADEMY <br /> CONVERSION OF PARKING STALLS TO PLAYGROUND. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per site plan approved by the City of Everett Public Works Department.Approved plans must remain on job-site <br /> at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site <br /> in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the improvements <br /> located therein. <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> Public Works Permit Fee Breakdown: <br /> Misc. Minor Permits(Landscape/Playground Site Work).......$25.00 <br /> PW Plan Review......................................................................$20.00 <br /> PW Site Inspection..................................................................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> ,544lr'a GFoa 05/27/2022 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> _APPLICANT/JOB SITE COPY _TREASURER _ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.