My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BEZOS ACADEMY 2024-08-07
>
Address Records
>
SMITH AVE
>
3201
>
BEZOS ACADEMY
>
3201 SMITH AVE BEZOS ACADEMY 2024-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 1:24:08 PM
Creation date
4/21/2024 12:47:31 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BEZOS ACADEMY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEINANICAL PERMIT APPLICaTION <br /> CITY OF EVERETT PERMIT SERVICES <br /> EVERETT SUBMITTAL INSTRUCTIONS: Drop off hard copy paper application&plan to 3200 Cedar Street 2nd Floor Intake Drop Box. <br /> WASHINGTON CONTACT INFORMATION: (P)425-257-8810 I (E)PermitServices@everettwa.gov I (W)everettwa.gov/permits <br /> (Blue or Black Ink Only Please) PROJECT SITE INFORMATION <br /> PROJECT SITE ADDRESS: STREET 3201 Smith Ave PARCEL#: 00439074401300 <br /> CITY Everett STATE WA ZIP 98201 <br /> SUITE/UNIT#: FLOOR#: Ground ADDITIONAL LOCATION INFORMATION: None <br /> TENANT/BUSINESS NAME(if non-residential):Bezos Academy Everett Transit Station <br /> CONTACT INFORMATION <br /> OWNER NAME: City of Everett <br /> OWNER MAILING ADDRESS: STREET 2930 Wetmore Avenue,Suite 10A <br /> CITY Everett STATE WA ZIP 98201 <br /> OWNER PHONE:425-257-8700 (OWNER EMAIL: <br /> CONTRACTOR COMPANY NAME: � 1 <br /> WA STATE CONTRACTOR LICENSE#(REQUIRED '%'` �OO 'r EVERETT BUSINESS LICENSE#(REQUIRED) fq <br /> CONTRACTOR ADDRESS: STREET <br /> CITY STATE ZIP <br /> CONTRACTOR PHONE: CONTRACTOR EMAIL: <br /> PRIMARY CONTACT: ❑OWNER ❑CONTRACTOR ✓❑OTHER(Please Specify) Bassani Architects <br /> CONTACT NAME: CONTACT PHONE:206-340-9500 <br /> Stephanie Tung CONTACT EMAIL:stung@bassettiarch.com <br /> MECHANICAL PERMIT INFORMATION <br /> VALUATION OF WORK: $63,210 ASSOCIATED PERMIT#(if applicable): <br /> (Valuation shall include the prevailing fair market value of all labor,materials,and equipment needed to complete the work,whether actually paid or not.) <br /> BUILDING TYPE: ❑SFR ❑Townhouse ❑Duplex ❑ADU ❑Multi-Family-#Units: ❑✓Commercial ❑Accessory Structure <br /> DESCRIPTION OF WORK: <br /> Tenant improvement work to provide A 3-classroom preschool on the ground floor of the transit building.The current use of the building is for 421 bus transportation. <br /> MECHANICAL PERMIT FIXTURE COUNT (SCOPE OF WORK) <br /> Fixture Fixture <br /> Count List of Fixtures Count List of Fixtures <br /> (Qty) (Qty) <br /> A/C Unit(attach plan with location of outdoor unit) Gas Piping-List#of outlets in fixture count <br /> _Air Handling Unit** Gas Appliance** <br /> Boiler(most require backflow prevention)** Gas Fireplace,Insert,and/or Log(*for commercial bldgs) <br /> Commercial Refrigeration(Walk-in coolers,VRF,VRV,etc.) Gas-Other(List Type): ** <br /> Commercial Ventilation(corridors,stairwell,pressurization,etc.) Heat Pump(attach plan with location of outdoor unit) <br /> Compressors/Generators(building permit may be required)** Heat Pump Ductless(attach plan with location of outdoor unit) <br /> Clothes Dryer Exhaust Hydronic Piping <br /> Duct System(additions,alterations) Unit heater(commercial use) <br /> 2 Exhaust Fan(residential or commercial use) Water Heater(gas or electric) <br /> Exhaust Hood(residential over stove) Wood/Pellet Stove or Insert <br /> Exhaust Hood Type I *** Other(List Type): <br /> Exhaust Hood Type II *** Other(List Type): <br /> Furnace(residential) Other(List Type): <br /> * For commercial gas fireplaces,please attach plans and manufacturer's installation manual. <br /> ** Under Description of Work,please include Type of Equipment,model#'s,ad detailed description of work,and the location of the equipment. <br /> Type I hood and Type II hoods shall be on a stand alone Mechanical Permit application and requires plan review.Please submit the required documents as <br /> *** described in the associated Checklists online at everettwa.gov/permits under the Checklists&Handouts tab. <br /> ACKNOWLEDGEMENT:I have reviewed this application and confirm the information contained herein is true and correct. Work done pursuant to this permit must comply with <br /> current federal,state,and local law. The granting of a permit only authorizes approved work and no deviations therefrom.Deviations must first be authorized in writing from the <br /> Building Official before being authorized under any circumstance.I am the owner,or 1 am authorized by the owner of this property to perform the work for which application is made, <br /> and I comply with the State Contractors Law 18.27 RCW and 296.200A WAC. <br /> City of Everett Official Use Only <br /> Date:2022. PERMIT# m <br /> 2-Stephanie Tung 16:17:33-07.00, 5/12/2022 - G 6 <br /> Owner/Authorized Agent Signature Date (Revised 4/21/2022) ./ . <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.