My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10024 19TH PL W 2016-06-02
>
Address Records
>
19TH PL W
>
10024
>
10024 19TH PL W 2016-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 2:09:31 PM
Creation date
6/2/2016 2:10:10 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH PL W
Street Number
10024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington Department of <br /> Fish&Wildlife <br /> HYDRAULIC PROJECT APPROVAL POBox43234 <br /> W ^&par:mall Olympia,WA 98504-3234 <br /> FISH�aWILDLIFE <br /> (360)902-2200 <br /> Issued Date: January 22, 2015 Permit Number: 2015-4-41+01 <br /> Project End Date: October 15, 2015 FPA/Public Notice Number: N/A <br /> Application ID: 1650 <br /> DRIVING DIRECTIONS: <br /> Merge onto 1-5 S <br /> 22.5 mi <br /> Take exit 189 for WA-99 S/WA-526 W toward Everett Mall Way/WA-527 S/Broadway/Whidbey Island Ferry <br /> 0.2 mi <br /> Keep right at the fork, follow signs for WA-526 W/Mukilteo/Whidbey Is Ferry and merge onto WA-526 W <br /> 1.0 mi <br /> Take the Evergreen Way exit <br /> 0.2 mi <br /> Follow Evergreen Way and 100th St SW to 19th PI W <br /> 2.2 mi/5 min <br /> Turn left onto Evergreen Way <br /> 1.3 mi <br /> Turn right onto 100th St SW <br /> 0.8 mi <br /> Turn left onto 19th PI W <br /> 207 ft <br /> Arrive at <br /> 10024 19th PI W <br /> Everett, WA 98204 <br /> APPLY TO ALL HYDRAULIC PROJECT APPROVALS <br /> This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically <br /> Chapter 77.55 RCW. Additional authorization from other public agencies may be necessary for this project. The person <br /> (s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional <br /> authorization from other public agencies (local, state and/or federal)that may be necessary for this project. <br /> This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person <br /> (s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. <br /> This Hydraulic Project Approval does not authorize trespass. <br /> The person(s)to whom this Hydraulic Project Approval is issued and operator(s)performing the work may be held liable <br /> for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic <br /> Project Approval. <br /> Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one <br /> hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. <br /> All Hydraulic Project Approvals issued under RCW 77.55.021 are subject to additional restrictions, conditions, or <br /> revocation if the Department of Fish and Wildlife determines that changed conditions require such action.The person(s) <br /> to whom this Hydraulic Project Approval is issued has the right to appeal those decisions. Procedures for filing appeals <br /> are listed below. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.