Laserfiche WebLink
2024 Stormwater System Development Fee Calculations <br /> Permit#: PW2310-117 Additional Notes: <br /> Project Address: 2601 23rd St Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: Hot tub pad calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Terri Jorgenson Date: 10/30/2023 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Thad Newport Date: 10/30/2023 <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2310-117 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 64 SF • <br /> Stormwater System Dev Fee: $19.12 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: - SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br /> • <br />