Laserfiche WebLink
Page 1 of 1 <br /> QKmzan &Associates, Inc. Field <br /> Geotechnical Engineering•Environmental Engineering Report NO.:09623422DFRI I1023EC <br /> Construction Testing and Inspection <br /> DATE: 11/10/2023 Set Count: CONTRACTOR: Modisette <br /> PROJECT#: 09623422 PERMIT#: B2011-037 <br /> PROJECT: Modisette Garage INSPECTOR: Eddie Canfield <br /> LOCATION: 2130 State St,Everett JURISDICTION: City of Everett <br /> KA P.M.: Jeff Mercer WEATHER: Cloudy TEMP:54°F <br /> A Krazan representative visited the project site today to observe the installation of epoxied dowels. Upon our arrival on site, <br /> we met with the contractor to discuss installation locations and details. <br /> Today,we observed the installation of approximately fifty(50)all threaded anchors for a new garage structure. The holes for <br /> installation had been drilled and cleaned prior to our arrival on site. The holes appeared to be the correct size(3/4"diameter), <br /> depth(8"embedment),spacing(24"on center),and to be free of dust and debris. Simpson SET-XP(expiration:05/25/25) <br /> was utilized to fill the holes prior to twisting and inserting the 5/8"diameter all threaded rods until bottomed out and epoxy <br /> was extruding from the holes. <br /> Site Photos: <br /> pRN � 1 <br /> I <br /> Reviewed By: �( ASTM Test#: Asset Number(s): <br /> To the best of my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood(425)485-5519-Poulsbo(360)598-2126-Tacoma(253)939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Kmzan&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information has been provided by others on site.The test results apply only to the specific locations,and items inspected or tested.Template date 11/12/2023 <br />