My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1718 W MARINE VIEW DR 2024-10-25
>
Address Records
>
W MARINE VIEW DR
>
1718
>
1718 W MARINE VIEW DR 2024-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 9:18:12 AM
Creation date
4/24/2024 9:11:12 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1718
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> _ _I<XaZM &A s s o c i a t e s, I n C. Field <br /> SWIM_ SIM <br /> Geotechnical Engineering• Environmental Engineering Report NO.:09623164DFR4272023ZZ <br /> Construction Testing and Inspection <br /> DATE: 4/27/2023 Set Count: CONTRACTOR: NWQRD <br /> PROJECT#: 09623164 PERMIT#: B2109-057 <br /> PROJECT: Everett Yacht Club. INSPECTOR: Zelalem Zerihun <br /> LOCATION: 1720 West Marine View Dr.Everett,WA JURISDICTION: City of Everett <br /> KA P.M.: Jeffrey S.Mercer WEATHER: Clear TEMP:55°F <br /> A Krazan & Associates, Inc. representative visited the above-said project as per the <br /> contractor's request and inspected reinforcing steel for wood post foundations. <br /> ----------------------------------------------------------------------------------------------------- <br /> The rep reviewed AHJ approved structural plans and inspected several structural items <br /> including but not limited to wood post foundation per 7/S-2.0, hold-downs type HD 14, <br /> MST straps, beam hangers, straps for collector with overlaps, A35 & LTN's, <br /> blockings, steel hardware @ beams, anchor bolts @ shear walls, deck to building top & <br /> bottom connections, deck rim to building connections, drag strut at entry and so on. See <br /> representative photos below. <br /> ------------------------------------------------------------------------------------------------------- <br /> Conclusion—All structural parts are in place before insulation and sheathing on shear <br /> walls. The next Krazan's visit will be for shear walls fastening. <br /> r <br /> x <br /> 'C <br /> s <br /> 1 '. _ _ • <br /> " I <br /> Reviewed B : ASTM Test#: Asset Number(s): <br /> To the best my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood (425)485-5519 - Poulsbo (360) 598-2126 - Tacoma(253)939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Imran&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contactor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information has been provided by others on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.