Laserfiche WebLink
• • <br /> Comments regarding Plan Check B2202-059 (dated February 28 2022) <br /> I)Architect has been hired and has prepared and submitted plans for review dated 09/02/2022. <br /> 2) Refer to sheets A0.1,A0.6. <br /> 3)The whole building is proposed to be getting a full NFPA 13 sprinkler and alarm system as a deferred submittal. <br /> 4)Tower is to be used as storage (S-2).Separated by rated door(existing)A0.6 <br /> 5) Refer to A0.6. Building structural systems have been reviewed and updated to meet new proposed occupancy as <br /> found on the S sheets. <br /> 6) 2nd exit provided for both mail floor and upper floor. <br /> 7) Grease interceptor included, attached to submittal is an agreement for servicing. <br /> 8) 2nd exit provided for both mail floor and upper floor. <br /> 9) Signage provided A0.6, A2.0 <br /> 10) Refer to A2.0. • <br /> I) Refer toA0.3. <br /> 12) Existing'stair enclosure complies. <br /> 13) Refer to A0.6 for accessible routes. <br /> 14) Refer'to'1/A3.1,3/A3.2,'2/A5.0. <br /> 15)Stair and desk guardrails are bidder designed per their system and deferred submittal. <br /> 16) Refer to A3.2 and 2/A5 0 for design requirements for the stair system <br /> 17)Stair handrails inditatedA2/5.0`for design requirements to be met. <br /> 18)Stair riser requirements indicated A2/5.0 for design requirements to be met. <br /> 19) Refer to 3/A3.2. Landing requirements indicated A2/5.0 for design requirements to be met. <br /> For Structural response (Attached) <br /> Thank you <br /> Paul Richards <br /> Architect,AIA, NCARB, LEED®AP BD+C <br /> Page 2 <br />