Laserfiche WebLink
Page 1 of 1 <br /> rc.. <br /> .MKIUZan <br /> &A s s o c i a t e s, I n c. Field <br /> Geotechnical Engineering. Environmental Engineering Report NO.:09623164DFR3312023ZZ <br /> Construction Testing and Inspection <br /> DATE: 3/31/2023 Set Count: CONTRACTOR: NWQRD <br /> PROJECT#: 09623164 PERMIT#: B2109-057 <br /> PROJECT: Everett Yacht Club. INSPECTOR: Zelalem Zerihun <br /> LOCATION: 1720 West Marine View Dr.Everett,WA JURISDICTION: City of Everett <br /> KA P.M.: Jeffrey S.Mercer WEATHER: Clear TEMP:55°F <br /> A Krazan&Associates, Inc. representative visited the above-said project as per the <br /> contractor's request and inspected reinforcing steel for wood post foundations. <br /> ------------------------------------------------------------------------------------------------------ <br /> The rep reviewed AHJ approved structural plans and identified required reinforcing steel <br /> grade, size, spacing, count, and concrete cover. The contractor placed(7)#6 bars through the <br /> wood post each way in the foundations sized 51X48 and acceptable as per 7/S-2.0. <br /> ---------------------------------------------------------------------------------------------------- <br /> r T OC.r wl- <br /> PWW <br /> vtru Rrre <br /> ' .-moat Mot I. <br /> vcr <br /> r - <br /> r <br /> S <br /> � N <br /> p Parr"satto,tr r, <br /> Y <br /> P05T ^_ <br /> Reviewed B ASTM Test#: Asset Number(s): <br /> To the best my knowledge,the above WAS performed in accordance with the approved plans,specifications and <br /> regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood(425) 485-5519 - Poulsbo (360) 598-2126 - Tacoma(253) 939-2500 <br /> The information provided on this report is prepared for the exclusive use of the client.This report may not be reproduced in any format without the written permission of the client and Krarsn&Associates.This report <br /> indicates our inspectors observation and testing results based on site conditions and contractor activities.This information is subject to review prior to final submittal.By signing this report,our inspector does not accept <br /> responsibility for validity of results.The same information bas been provided by others on site. <br />