Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' M2301-090 Description: Commercial mechanical-TI ductwork modification <br /> Applied: 1/26/2023 Approved: 2/28/2023 Site Address: 10830 19TH AVE SE <br /> Issued:3/2/2023 Finaled:8/22/2023 City,State Zip Code: EVERETT,WA 98208 <br /> Status: FINALED Applicant: RIGHT ON HEATING SHEET METAL <br /> Parent Permit: B2205-016 Owner:SHOLUDKO REAL ESTATE HOLDINGS LLC <br /> Parent Project: Contractor: RIGHT ON HEATING SHEET METAL <br /> Details: <br /> Also adding(3)exhaust fans and venting dryer <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/3/2023 3/3/2023 MECH 04-ROUGH JEFF M RHODE CORRECTION see notes <br /> IN REQUIRED <br /> Notes: <br /> 3/2/2023 1:29 PM RIGHT ON HEATING SHEET METAL <br /> Contact Name:RIGHT ON HEATING SHEET METAL <br /> Site Address:10830 19TH AVE SE-Ste.A <br /> Phone:4253354207 <br /> e-Mail:jeanie@rightonheating.com <br /> -installation and connection to exhaust fans needed to be installed-nail plating of dryer vent504.7 Protection Required Protective shield plates shall be <br /> placed where nails or screws from finish or other work are likely to penetrate the clothes dryer exhaust duct.Shield plates shall be placed on the <br /> finished face of all framing members where there is less than 11/4 inches(32 mm)between the duct and the finished face of the framing member. <br /> Protective shield plates shall be constructed of steel,have a thickness of 0.062 inch(1.6 mm)and extend not less than 2 inches(51 mm)above sole <br /> plates and below top plates.-crawl space ducting ok <br /> 3/29/2023 3/29/2023 MECH 04-ROUGH JEFF M RHODE APPROVAL see notes <br /> IN <br /> Notes: <br /> 3/28/2023 3:09 PM RIGHT ON HEATING SHEET METAL <br /> Contact Name:RIGHT ON HEATING SHEET METAL <br /> Site Address:10830 19TH AVE SE <br /> Phone:4253354207 <br /> e-Mail:jeanie@rightonheating.com <br /> jmr changed Inspection Type from MECH 06-FINAL to MECH 04-ROUGH IN <br /> -fans installed and connections made-nail plates installed on dryer duct-switched inspection to rough in final inspection to happen when all mech <br /> components are operational <br /> I <br /> Printed:Tuesday,22 August,2023 1 of 2 rk <br /> SUPERION <br />