Laserfiche WebLink
INSPECTION REPORT <br /> Date: �-29"'�Q Permit: L2 ^ Q`''l <br /> �N r, <br /> Contractor.GIoo''S 11 C42S)2 2 _4-1(02 <br /> OUN\-' Owner <br /> Site Address: ?�' Qg- on ( * <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ooftop Units CI Water Service <br /> El Grounding ❑Insulation hanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTR CONSULTATION: <br /> R VAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE MIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: 3 I k <br /> EIR(4/09) (C--lJA7GRE FORM &PROM TIONS•425,48R-8900 <br />