Laserfiche WebLink
NEUDORFER r - <br /> NE�B:B <br /> ENGINEERS <br /> WVAMNEUDDRFERENGINEERS,COM <br /> AN Eintegra COMPANY <br /> Energy Recovery Unit <br /> PROJECT: Boeing 40-92 Safety Center Upgrades DATE: 2/22/2024 <br /> LOCATION: Everett,WA CONTACT: Moon Kim <br /> PROJECT#: 2024-0125 AUTHOR: <br /> ERV-01 Supply Outlet Summary <br /> System/Unit Area Served Type of Outlet Size LxW/D AK Design Prelim Final Final% Remarks <br /> Reading Type Airflow Airflow Airflow <br /> Outlet-01 Lobby 252 Rotating G-8 16"x6" 0.74 210 120 220 105 <br /> Vane <br /> Outlet-02 Lobby 252 Rotating G-8 14"x6" 0.65 110 115 105 95 <br /> Vane <br /> Outlet-03 Lobby 252 Flowhood D-8 8" 1.00 1 120 90 125 104 <br /> Outlet-04 Exhibition 250 Flowhood D-8 10" 1.00 300 215 320 107 (1) <br /> Outlet-05 Hallway 228 Rotating G-8 201lx4" 0.38 50 135 60 120 (3) <br /> Vane <br /> Outlet-06 Exhibition 250 Flowhood D-8 8" 1.00 160 160 170 106 <br /> Outlet-07 Lobby 252 Flowhood D-8 8" 1.00 150 135 170 113 <br /> Outlet-08 Lobby 252 Flowhood G-8 20"x4" 1.00 70 110 85 121 (3) <br /> Totals: - 1170 1080 1255 107 - <br /> ERV-01 Exhaust Inlet Summary <br /> System/Unit Area Served Type of Inlet Size LxW/D AK Design Prelim Final Final% Remarks <br /> Readina Type Airflow Airflow Airflow <br /> Inlet-01 Exhibition 250 Pitot Tube Duct 19.5x12.5 1.28 1252 1235 1235 99 <br /> Totals: - - 1252 1235 1235 99 <br /> Neudorfer Engineers <br /> Page 13 of 41 <br />