Laserfiche WebLink
CITY OF EVERETf <br /> PERMIT APPLICATION INFORMATION <br /> CONSTRUCTION MANAGER/PA/PM: Carson Hornor/Pamela Turk <br /> PROJECT NAME: 40-36 FSI (Fuselage System Integration) Phase 1—Foundations <br /> LOCATION (BLDG/FLR/COL): 40-36, First Floor,Col. 13.5 & N.3 <br /> PROJECT TIMELINE& PERMIT NEED DATE: 8/15/23 (or earlier) <br /> MAXIMO JOB#: W9265275 <br /> CHARGELINE#: 66=1200000=DETR9447=C6TAF8MJ=X=CR=99TF=5A5 <br /> CONTRACT PRICE OF WORK BEING $1,000,0000 <br /> PERMITTED: <br /> CONTRACTOR NAME: Skanska USA Building Inc. <br /> CONTRACTOR E-MAIL Jason.Floyd@skanska.com <br /> CONTRACT STATE LISC#: SKANSUB985RT <br /> CONTRACTOR CITY OF EVERETT LISC#: 044389 <br /> BRIEF OVERVIEW OF PROJECT SCOPE: Install 40-36 FSI (Fuselage System Integration)Tool Phase 1— <br /> (Do not include electrical and mechanical Foundations. <br /> scope and costs. Contractors will secure <br /> these permits) <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br /> structural calculations. <br /> For Public Work permits, include (1)site plan, (4)full size drawing sets and (2) sets of drainage calcs. <br /> For questions, please contact Todd Haberlack at 425-260-2668 or via email at todd.i.haberlack@boeing.com <br />