My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4916 24TH AVE W 2024-08-06
>
Address Records
>
24TH AVE W
>
4916
>
4916 24TH AVE W 2024-08-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2024 1:18:26 PM
Creation date
4/26/2024 12:04:30 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4916
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERCO ENGINEERING, PC <br /> (Professional Service Corp) <br /> 9 -21 St. NW D <br /> Stananw000d,, WA 98292 <br /> Telephone (360) 629-6710 <br /> SEP 0 12021 <br /> Date: 8/1 3/21 CITY OF EVERETT <br /> Permit Services <br /> To: City of Everett <br /> Plan Review Comments, Everett File #B2106-048 <br /> Attn.: Rakeeb Khan <br /> Re: Fuliweiler Const <br /> 4916 24th Ave West <br /> Itemized Response to abbreviated ( as italic) Structural Review comments of July 29. 2021 <br /> 1 . Fdn P/an post sizes, connections and references Sht Sl. 1: Some Posts were already <br /> called out on S1 .2 and on Detail 10/A5.1 . However add'I comments for clarity have <br /> been added. Simpson ECCLRQ 44 is called out for some posts. <br /> 2. Fdn plan ftgs to be provided for all loads and wall locations all bearing walls: <br /> stair base ftg is now added below the stair landing support the stair stringers. Also <br /> the outside stair stringers are supported by partitions which have blocking along the <br /> partition floor line. <br /> 3. Framing detail at exterior wall at stairway. Detail added to the detail sheet. <br /> 4. Provide stair half wall/handrail detail: A rabbit cut in the bottom of the cripple studs <br /> of the half wall will provide a "lockin" to the upper floor rim jst and direct support on <br /> the partition below. Blocking between the studs will tie them into the joists and rim <br /> board and sufficiently resist a 50p1f vertical load. Vertical loading will be transferred <br /> to the partition below and the horizontal loading will dissipate into the floor <br /> diaphragm and jsts. 12d nails secure the half wall to the blocking and rim joist. <br /> A detail will be provided. <br /> 5. Floor Elm Sizing at Fireplace:The beam has been recalculated as a 4x10 DF#2. <br /> 6. Framing detail for Gar Beam: Architect will provide updated detail. m. <br /> 7. Beam 5.5 x 13.5 to break wall plate:The beams in the Kit/Dining area will set on-top <br /> of the double plates flush with the top of the joists. The cut through the top plate will <br /> be reinforced with an RPS (Retrofit plate strap) And the rim joist will span the break <br /> plus the wall sheathed with OSB. <br /> 8. Entry Beam called out "LUC"• This has been corrected as an LVL beam. <br /> 9. _1st hanger cal/outs: The hangers are now called out on the plans. /1 V <br />
The URL can be used to link to this page
Your browser does not support the video tag.