Laserfiche WebLink
V Y ST <br /> COAST <br /> STRUCTURAL h 11 I <br /> ENGINEERING, INC. <br /> Structural <br /> 1 a. Dormer framing has been labeled <br /> b. Posts are specified <br /> c. Outlooks have been added. <br /> d. Details have been added. <br /> 2. This will be platform framed. A note has been added on the framing plans to keep the rim, double <br /> top plates and sill continuous over the opening. <br /> 3. a. Correct—all beams shown are dropped and do not require hangers. <br /> b. Pressure treated has been indicated. <br /> c. Shear flow detail has been added. <br /> Sinc y, <br /> 3-11-22 <br /> ravis McCandless PE, SE S S. �C1� <br /> West Coast Structural Engineering Inc. J .�, '�ryd'cr\ <br /> t.7 cr' <br /> r <br /> w� <br /> .oSI 3,g799 ,w <br /> ANAL E <br />