Laserfiche WebLink
WEST <br /> COAST <br /> AL° <br /> ENGINEERING,JINh <br /> C. <br /> Structural <br /> 1 a. Dormer framing has been labeled <br /> b. Posts are specified <br /> c. Outlooks have been added. <br /> d. Details have been added. <br /> 2. This will be platform framed. A note has been added on the framing plans to keep the rim, double <br /> top plates and sill continuous over the opening. <br /> 3. a. Correct—all beams shown are dropped and do not require hangers. <br /> b. Pressure treated has been indicated. <br /> c. Shear flow detail has been added. <br /> Sinc y, <br /> 3-11-22 <br /> ravis McCandless PE, SE ,c-,S•�Mce4 <br /> VOSI 41,6 <br /> West Coast Structural Engineering Inc. J <br /> r - <br /> 38799 <br /> ICNAL LNG <br /> { <br />