Laserfiche WebLink
WEST <br /> COAST <br /> STRUCTURAL i' <br /> ENGINEERING, INC. <br /> 3. a. Correct—all beams shown are dropped and do not require hangers. <br /> b. A shear flow detail has been added. <br /> c. Calculations have been provided for the floor joist. The girder truss has been moved 2 ft <br /> over the GLB below. <br /> 4. a. Notes are now shown correctly. <br /> b. Footing has been moved. <br /> c. Foundation has been revised to follow mechanical room. <br /> Sinc y, <br /> 3-11-22 <br /> ravis McCandless PE, SE ASS. McC 4 <br /> West Coast Structural Engineering Inc. J <br /> -r I, CP <br /> o ,z,38799,..� <br /> G`+ <br /> `S/ONAL EN <br />