Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: PW2204-023 Additional Notes: <br /> Project Address: 1017 100TH ST SW Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: SITE WORK FOR NEW SFR calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: THAD NEWPORT Date: 4/20/2022 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: BXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: - SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2204-023 Type of Construction: New Construction/Redevelopment <br /> Square Feet of New Plus Replaced Hard Surfaces: 2,361 SF <br /> Stormwater System Dev Fee: $678.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />