Laserfiche WebLink
WEST <br /> COAST <br /> STRUCTURAL I I 1 11 <br /> ENGINEERING, INC. <br /> 3. a. Correct—all beams shown are dropped and do not require hangers. <br /> b. A shear flow detail has been added. <br /> c. Calculations have been provided for the floor joist. The girder truss has been moved 2 ft <br /> over the GLB below. <br /> 4. a. Notes are now shown correctly. <br /> b. Footing has been moved. <br /> c. Foundation has been revised to follow mechanical room. <br /> Sinc y, <br /> 3-11-22 <br /> ravis McCandless PE, SE SS mcciel <br /> 4, <br /> West Coast Structural Engineering Inc. J "'16 <' <br /> r - <br /> 38799 <br /> jai-Gts F.RA� <br /> `ioNAL ECG <br />