Laserfiche WebLink
1 <br />Colbi Bertrand <br />From:Matthew Cooper <Matthew.Cooper@lakesideindustries.com> <br />Sent:Friday, February 9, 2024 1:50 PM <br />To:Colbi Bertrand <br />Cc:Mitchell Sorestad <br />Subject:RE: 4211 Phase 2 Aggregate Pricing <br />Colbi, <br /> <br />Our Pit which is at 11525 Hand Road in Monroe will be where this is needed to be picked up from. <br /> <br />CSTC (5/8” minus commercial) is $17/ton <br />CSBC (1 ¼” minus commercial) is $18/ton <br /> <br />Truck and trailer would be about $190 per hour plus the cost of the material. <br /> <br />If you decide to get the material from us please give us plenty of noƟce so we can make sure we have enough material <br />there for you. <br /> <br />Thanks, <br /> <br />Matthew Cooper, Project Manager | Lakeside Industries, Inc. | <br />o 425.743.1289 | c 425.606.0467 | f 360.794.3399 | <br />Monroe Office | PO Box 247 | Monroe, WA 98272 | lakesideindustries.com <br />matthew.cooper@lakesideindustries.com <br /> <br /> <br />From: Colbi Bertrand <CBertrand@imcoconstruction.com> <br />Sent: Friday, February 9, 2024 9:10 AM <br />To: Matthew Cooper <Matthew.Cooper@lakesideindustries.com> <br />Cc: Mitchell Sorestad <MSorestad@imcoconstruction.com> <br />Subject: RE: 4211 Phase 2 Aggregate Pricing <br /> <br />Caution! EXTERNAL SENDER Do not click links or open attachments unless you KNOW that the sender and content are safe. <br />sophospsmartbannerend Hi MaƩhew, <br /> <br />That’s okay if you rock doesn’t meet spec, we would sƟll like to get some pricing from you. <br /> <br />Could you quote CSBC (1.25” minus or whatever you have that’s close) and then also CSTC (5/8” minus or whatever you <br />have that’s close). <br /> <br />Thank you, <br /> <br />COLBI BERTRAND <br />Field Engineer <br />Cell: 564.209.3401 <br />Corporate: 360.671.3936