My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3 <br /> <br /> <br />Proudly building complex projects with <br />integrity, excellence, and safety. <br />COMMITTED TO RELENTLESS SAFETY <br /> <br />IMCO is an Equal Opportunity Employer. <br /> <br />From: Front Desk 2 <FD2@riversidesandgravel.com> <br />Sent: Friday, February 9, 2024 10:04 AM <br />To: Colbi Bertrand <CBertrand@imcoconstruction.com> <br />Cc: Kevin Crocker <Kevin@riversidesandgravel.com> <br />Subject: RE: 4211 Phase 2 Aggregate Pricing <br /> <br /> <br />IMCO Email Security <br />Warning: Sender @FD2@riversidesandgravel.com is not yet trusted by your organization. <br />Please be careful before replying or clicking on the URLs. <br />Report as Phishing Safe Email <br />powered by Graphus® <br />Hello, <br />Here is your estimate: <br />About 400 tons of light loose riprap (4-8”) *Our 4-8 inch rock also has some ½ - 1 man rocks mixed in- <br />this would be the closest product to 4-18” that we have. Delivery included would be about $13,800 <br />5000-tons of CSBC (1.25” minus) Delivery included would be about $162,500 <br />CSTC (5/8” minus) 300 Tons delivered would be about $10,650 <br /> <br />Pricing is based on TRUCK AND TRAILER – hauling about 30 Tons at a time. These prices are ball park <br />costs subject to change once we have all the details for product, project, schedule and delivery. These <br />prices are for private jobs (not prevailing wage jobs). If this is a prevailing wage job, we can work up a <br />different quote. We look forward to working with you. <br />Thanks
The URL can be used to link to this page
Your browser does not support the video tag.