My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
6 <br />About 400 tons of light loose riprap <br />5000-6000 tons of CSBC (1.25” minus) <br />CSTC (5/8” minus) <br />Quarry spalls <br /> <br />It would be delivered to 6133 Lake Chaplain Road, Monroe, WA 98272 <br /> <br />Thank you, <br /> <br /> <br />COLBI BERTRAND <br />Field Engineer <br />Cell: 564.209.3401 <br />Corporate: 360.671.3936 <br />Web: imcoconstruction.com <br /> <br /> <br /> <br />Proudly building complex projects with <br />integrity, excellence, and safety. <br />COMMITTED TO RELENTLESS SAFETY <br /> <br />IMCO is an Equal Opportunity Employer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.