Laserfiche WebLink
Page 36 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00015090Takeoff Qty: <br />Bid Qty:1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />227,800.1112,000.000.0050,000.0014,076.460.0080,931.3770,792.2826,292.1844,500.10Total <br />227,800.1112,000.000.0050,000.0014,076.460.0080,931.3770,792.2826,292.1844,500.10U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.004398.322661.8057316.3890720.00000.0014720.0000 <br />CYUnit:360.00Quantity:Concrete Demo139-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />82,158.4112,000.000.000.0010,278.960.0040,166.3919,713.067,319.7812,393.28Total <br />228.2233.330.000.0028.550.00111.5754.7620.3334.43U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />16,431.68200.013972.00005.0000797.58907.20000.1389110.7763 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />34.425898.56530.55561.8000200.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />5.00Equipment Pcs:4.00Labor Pcs:50.00Crew Hrs:100.00Eff:7.2UHProd:(Mod) Demo X470/Brkr/3 MenDMX3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />10,278.9616.27108.5015.00TCY631.581.00Dump Fee Reinf Conc/TCY3DFCNR <br />12,000.00150.00100.00150.00HR80.001.00Demo Bomber Truck - OPER5HHDD <br />2,485.9749.72109.7545.99HR50.001.00185 CFM Compressor8AC185 <br />20,000.0020,000.00109.7520,000.00LS1.001.00→ Concrete Demo Tools & <br />Equip8CONCDEMO <br />2,478.1649.56109.7545.16HR50.001.00Hyd Brker 5 K (Min JD 200)8DMB05 <br />6,271.74125.43109.75115.48HR50.001.00JD 200 Excavator 20MT8EX200 <br />8,759.04175.18109.75161.48HR50.001.00JD 330 Excavator 33MT8EX330 <br />171.483.43109.753.13HR50.001.00Jack Hammer/Rock Drill8MSJH <br />8,283.0582.83110.0046.86MH100.002.00Laborer - General G3/4LG <br />5,739.33114.79110.0066.10MH50.001.00Oper Ldr->8 CY/Ex->50MT G1O1 <br />5,690.68113.81110.0065.51MH50.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:4.00Quantity:Flocculator Mechanism Demo140-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />70,481.950.000.000.000.000.0037,987.3232,494.6312,033.7620,460.87Total <br />17,620.490.000.000.000.000.009,496.838,123.663,008.445,115.22U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />8,810.24382.00000.50008.0000881.02440.050020.000017,620.4875 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5,115.2175101.545780.00000.0125320.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:80.00Crew Hrs:100.00Eff:20HUProd:(Mod) Carpenter Crew - 2 ManC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />31,595.48394.94109.75371.29HR80.001.00Mantwoc M85 90 T Crwlr8CRCM85 <br />6,391.8439.95109.7536.40HR160.002.00Scissor Lift 20' Elec OSR8MLS20 <br />16,482.46103.02110.0059.01MH160.002.00Carpenter JourneymanCJ <br />6,626.4482.83110.0046.86MH80.001.00Laborer - General G3/4LG <br />9,385.73117.32110.0067.63MH80.001.00Oper Crane >200T G1AAOC3 <br />LSUnit:1.00Quantity:Demo Sub926-00Activity: