Page 49 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />7,955.1049.72109.7545.99HR160.001.00185 CFM Compressor8AC185 <br />32,964.94103.02110.0059.01MH320.002.00Carpenter JourneymanCJ <br />EAUnit:12.00Quantity:Set New Mixers & Baffle Walls720-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />215,603.360.000.000.000.000.00108,371.07107,232.2939,711.4267,520.87Total <br />17,966.950.000.000.000.000.009,030.928,936.023,309.295,626.74U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />8,166.79392.20000.454526.4000816.67940.045522.000017,966.9467 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5,626.7392101.545788.00000.01141,056.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />3.00Equipment Pcs:4.00Labor Pcs:264.00Crew Hrs:100.00Eff:22HUProd:(Mod) Carpenter Crew - 3 ManC3Crew: <br />4 Basins w 3 mixer sections each = 12Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />87,278.00330.60109.75371.29HR264.001.00Mantwoc M85 90 T Crwlr %508CRCM85 <br />21,093.0739.95109.7536.40HR528.002.00Scissor Lift 20' Elec OSR8MLS20 <br />54,392.15103.02110.0059.01MH528.002.00Carpenter JourneymanCJ <br />21,867.2382.83110.0046.86MH264.001.00Laborer - General G3/4LG <br />30,972.91117.32110.0067.63MH264.001.00Oper Crane >200T G1AAOC3 <br />EAUnit:4.00Quantity:Install Flocculator Drives725-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />37,395.210.000.000.000.000.004,767.9532,627.2612,078.5620,548.70Total <br />9,348.800.000.000.000.000.001,191.998,156.823,019.645,137.18U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,674.40132.00000.50008.0000467.44010.050020.00009,348.8025 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />5,137.1750101.960280.00000.0125320.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:4.00Labor Pcs:80.00Crew Hrs:100.00Eff:20HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />2,222.1327.78109.7526.38HR80.001.00Genie 842 Forklift 8K 42'8FL08 <br />2,545.8231.82109.7530.68HR80.001.00Ford F450 Pipefitter8TKJ450P <br />13,252.8782.83110.0046.86MH160.002.00Laborer - General G3/4LG <br />19,374.39121.09110.0069.89MH160.002.00Pipefitter JourneymanPFJ <br />LSUnit:1.00Quantity:Purchase Flocculator Mechanisms727-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />**** Copied from 4211-30%%EW - 4211 WFP Upgrades 30% & EW ****Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />956,500.00956,500.00100.00956,500.00LS1.001.00MRI - Flocutioan Mixers2-FLOCMXRS <br />LFUnit:250.00Quantity:Install Wash Down Piping730-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />11,850.070.000.000.000.005,000.00795.576,054.502,210.333,844.17Total <br />47.400.000.000.000.0020.003.1824.228.8415.38U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />4,740.02800.0100100.00002.5000274.002810.00000.100027.4003