My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 60 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />40.845297.51040.66671.5000220.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />2.00Equipment Pcs:11.00Labor Pcs:20.00Crew Hrs:100.00Eff:1.5UMProd:(Mod) Screed Deck Pour 28P/6 MenCP6SCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />67,646.61186.35100.00186.35CY363.001.10SMPOINT - Class 4500 Concrete2CNR45 <br />450.00225.00100.00225.00EA2.001.00WESTERN - 28 M Conc Pump - <br />Travl4OP28T <br />1,361.253.75100.003.75CY363.001.10WESTERN - 28 M Conc Pump - <br />Yrdage4OP28Y <br />3,292.50164.63109.75150.00HR20.001.0028 M Conc Pump - OPER8OP28 <br />636.4531.82109.7530.68HR20.001.00Ford F450 Flatbed8TKJ450 <br />16,482.46103.02110.0059.01MH160.008.00Carpenter JourneymanCJ <br />4,969.8382.83110.0046.86MH60.003.00Laborer - General G3/4LG <br />SFUnit:3925.20Quantity:SOG-Cure Top/Bott Slab Conc420-52Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />1,557.580.000.000.00553.650.000.001,003.93378.78625.15Total <br />0.400.000.000.000.140.000.000.260.100.16U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,191.93330.000113,084.00000.3000334.64331,308.40000.00080.2558 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />0.159383.66080.0031327.100012.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:4.00Labor Pcs:3.00Crew Hrs:100.00Eff:327.1UMProd:Conc Cure/Protect 4 MenCPC4Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />553.650.14108.500.13SF3,925.201.00Burlap Cure Blanket3CCBCB <br />258.4686.15110.0048.86MH3.001.00Laborer ForemanLF <br />745.4782.83110.0046.86MH9.003.00Laborer - General G3/4LG <br />EAUnit:24.00Quantity:Set AB's for PEMB Columns496-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,114.190.000.000.00108.50240.000.001,765.69653.071,112.62Total <br />88.090.000.000.004.5210.000.0073.5727.2146.36U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />2,466.56320.035728.00010.8571205.99792.80000.357173.5704 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />46.3592103.01580.71421.400217.1400 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:2.00Labor Pcs:8.57Crew Hrs:100.00Eff:2.8UHProd:Carpenter Crew - 2 ManC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />240.0010.00100.0010.00EA24.001.00ANCHOR BOLTS & TEMPLATS2AB <br />108.50108.50108.50100.00LS1.001.00AB Templates3TEMP <br />1,765.69103.02110.0059.01MH17.142.00Carpenter JourneymanCJ <br />LS1.00016040Takeoff Qty: <br />Bid Qty: <br />CONC - TANK PADSBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor
The URL can be used to link to this page
Your browser does not support the video tag.