Laserfiche WebLink
Page 66 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />0.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20CHProd:(Mod) *** CREW ON FLY ***ZZCrew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />32,000.0032,000.00100.0032,000.00LS1.001.00Metal Grating2GRATING <br />36,000.0036,000.00100.0036,000.00LS1.001.00Fabricated Catwalk and Stairs2STFAB <br />2,060.31103.02110.0059.01MH20.001.00Carpenter JourneymanCJ <br />1,656.6182.83110.0046.86MH20.001.00Laborer - General G3/4LG <br />2,362.17118.11110.0068.10MH20.001.00Operator ForemanOF <br />LS1.00016100Takeoff Qty: <br />Bid Qty: <br />CHEMICAL FEED PROCESS PIPINGBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />101,286.720.000.000.000.001,500.0012,639.8887,146.8431,796.7255,350.12Total <br />101,286.720.000.000.000.001,500.0012,639.8887,146.8431,796.7255,350.12U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0036122.020277.4995141.8184714.20000.0014714.2000 <br />LOTUnit:1.00Quantity:Double Containment System710-15Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />19,920.730.000.000.000.000.001,591.1418,329.596,687.0811,642.51Total <br />19,920.730.000.000.000.000.001,591.1418,329.596,687.0811,642.51U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,984.14605.00000.20005.0000398.41460.020050.000019,920.7300 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />11,642.5100122.1973150.00000.0067150.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:50.00Crew Hrs:100.00Eff:50HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,591.1431.82109.7530.68HR50.001.00Ford F450 Pipefitter8TKJ450P <br />6,220.60124.41110.0071.89MH50.001.00Pipefitter ForemanPFF <br />12,108.99121.09110.0069.89MH100.002.00Pipefitter JourneymanPFJ <br />LOTUnit:1.00Quantity:Drain Pipe710-20Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />7,968.290.000.000.000.000.00636.457,331.842,674.834,657.01Total <br />7,968.290.000.000.000.000.00636.457,331.842,674.834,657.01U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />3,984.14502.00000.50002.0000398.41450.050020.00007,968.2900 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />4,657.0100122.197360.00000.016760.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:20.00Crew Hrs:100.00Eff:20HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />636.4531.82109.7530.68HR20.001.00Ford F450 Pipefitter8TKJ450P <br />2,488.24124.41110.0071.89MH20.001.00Pipefitter ForemanPFF <br />4,843.60121.09110.0069.89MH40.002.00Pipefitter JourneymanPFJ <br />DAYSUnit:13.00Quantity:Alum & Polymer Piping710-25Activity: