My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO Construction 5/1/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO Construction 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2024 3:02:12 PM
Creation date
5/1/2024 1:07:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO Construction
Approval Date
5/1/2024
End Date
4/30/2026
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Capital Improvements at the Water Filtration Plant
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003343
Total Compensation
$26,270,329.25
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2611
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 68 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />1.00Equipment Pcs:2.00Labor Pcs:10.00Crew Hrs:100.00Eff:0.5556HUProd:Mechanical Crew - 2 MenMC2Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,500.001,500.00100.001,500.00LS1.001.00Pipe Labeling Materials2-PIPELABEL <br />318.2331.82109.7530.68HR10.001.00Ford F450 Pipefitter8TKJ450P <br />2,421.80121.09110.0069.89MH20.002.00Pipefitter JourneymanPFJ <br />LS1.00016120Takeoff Qty: <br />Bid Qty: <br />MECHANCIAL PURCHASEBiditem <br />1.000 LS <br />LSUnit:.30Quantity:Mechanical Purchase710-00Activity: <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />238,497.77238,497.77100.00238,497.77LS1.001.00KDB - *** PIPE MATERIALS2PI <br />LS1.00016130Takeoff Qty: <br />Bid Qty: <br />CHEMICAL TANKSBiditem <br />1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />651,921.370.000.000.000.00573,900.0027,125.8950,895.4818,579.4832,316.00Total <br />651,921.370.000.000.000.00573,900.0027,125.8950,895.4818,579.4832,316.00U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0083121.179776.94291,552.1937420.00000.0024420.0000 <br />LSUnit:1.00Quantity:Purchase Alum & Polymer Tanks725-00Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />573,900.000.000.000.000.00573,900.000.000.000.000.00Total <br />573,900.000.000.000.000.00573,900.000.000.000.000.00U. Cost <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />Alum: 15000 gal <br />Poly: 12000 galNotes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />463,900.00463,900.00100.00463,900.00LS1.001.00AUGUSTA - FRP Alum & Poly <br />Tanks2-FRPTANKS <br />110,000.0055,000.00100.0055,000.00EA2.001.00AUGUSTA - Tank Shipping2-FRPTNSHIP <br />EAUnit:4.00Quantity:Alum Poly FRP Tank Install795-10Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />78,021.370.000.000.000.000.0027,125.8950,895.4818,579.4832,316.00Total <br />19,505.340.000.000.000.000.006,781.4712,723.874,644.878,079.00U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />6,501.78083.00000.333312.0000650.17810.033330.000019,505.3425 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />8,079.0000121.1797105.00000.0095420.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.50Equipment Pcs:3.50Labor Pcs:120.00Crew Hrs:100.00Eff:30HUProd:(Mod) Mechanical Crew - 3 MenMC3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />23,307.17388.45109.75358.34HR60.000.50Grove RT880E 80 Ton8CRRG8 <br />3,818.7231.82109.7530.68HR120.001.00Ford F450 Pipefitter8TKJ450P
The URL can be used to link to this page
Your browser does not support the video tag.