Laserfiche WebLink
Page 80 of4/19/2024 12:03 PMEverett WFPDB GMP WIP4211GMPWIP 110 <br />LS1.00017130Takeoff Qty: <br />Bid Qty:1.000 LS <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />74,209.270.000.0011,750.003,255.0018,600.0011,541.7729,062.5010,709.1218,353.38Total <br />74,209.270.000.0011,750.003,255.0018,600.0011,541.7729,062.5010,709.1218,353.38U. Cost <br />Unit/CHTotal Labor/MHBase Labor/MH$/MHMH/UnitUnit/MHManhours <br />0.0095107.638967.9755274.8491270.00000.0037270.0000 <br />LSUnit:1.00Quantity:PI - Diving to Seal Valves660-01Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />10,786.240.000.009,250.000.000.00138.881,397.36521.58875.78Total <br />10,786.240.000.009,250.000.000.00138.881,397.36521.58875.78U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />21,572.48000.50002.00000.5000307.24800.20005.00001,536.2400 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />875.780093.157315.00000.066715.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:5.00Crew Hrs:100.00Eff:5HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />9,250.009,250.00100.009,250.00DAY1.001.00CRUX - SUB - Diving Sub4DIVING <br />138.8827.78109.7526.38HR5.001.00Genie 842 Forklift 8K 42'8FL08 <br />828.3082.83110.0046.86MH10.002.00Laborer - General G3/4LG <br />569.06113.81110.0065.51MH5.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />LSUnit:1.00Quantity:PI - Drain Existing Pipes660-03Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />4,791.240.000.000.003,255.000.00138.881,397.36521.58875.78Total <br />4,791.240.000.000.003,255.000.00138.881,397.36521.58875.78U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />9,582.48000.50002.00000.5000307.24800.20005.00001,536.2400 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours <br />875.780093.157315.00000.066715.0000 <br />WA Bridge ConstructionWA0201WC:10Hrs/Shift:50 Hour Week - (5@10)510Calendar: <br />1.00Equipment Pcs:3.00Labor Pcs:5.00Crew Hrs:100.00Eff:5HUProd:(Mod) Pipe FL/3 MenPCF3Crew: <br />CMA covers misc discharge piping and fuel for initial drawdown.Notes: <br />TotalActual UCTax/OT %Unit CostUnitQuantityPcs/WsteDescriptionResource <br />1,627.501.09108.501.00DOL1,500.001.00Consumable Matl Allowance3CMA <br />1,627.501,627.50108.501,500.00EA1.001.00Pumping Equipment3PUMP <br />138.8827.78109.7526.38HR5.001.00Genie 842 Forklift 8K 42'8FL08 <br />828.3082.83110.0046.86MH10.002.00Laborer - General G3/4LG <br />569.06113.81110.0065.51MH5.001.00Oper Ldr<6 CY/Ex->30MT G2O2 <br />EAUnit:1.00Quantity:PI - Coating and Lining660-06Activity: <br />TotalTruckingGeneralSubConst MatlsPerm MatlsEquipmentTotal LaborBurdenBase Labor <br />2,526.610.000.000.000.001,500.00248.60778.01295.86482.15Total <br />2,526.610.000.000.000.001,500.00248.60778.01295.86482.15U. Cost <br />$/ShiftShifts/UnitUnits/ShiftShifts$/Crew HourUnits/Crew HrCrew Hrs/UnitCrew $/Unit <br />5,053.22000.50002.00000.5000205.32200.20005.00001,026.6100 <br />Base Labor/UnitTotal Labor/MHMH/UnitUnit/MHManhours