Laserfiche WebLink
<br />Lexington-Broadway Stormwater Imp. Phase 1 25 Scope of Services <br />Schedule <br />The anticipated schedule based on receipt of NTP in April 2024 is provided below. <br />Milestone Date <br />Notice to proceed April 2024 <br />60% milestone deliverables September 2024 <br />90% milestone deliverables November 2024 <br />Final design milestone deliverables March 2025 <br />Fee <br />The estimated total contract amount to complete professional services identified in the scope of <br />services is offered on a time-and-materials basis, not to exceed $877,460 as shown below. <br /> <br />Task <br />Number <br />Description Estimated Fee <br />100 Project Management $80,390 <br />200 Survey and Utility Location $17,580 <br />300 Geotechnical Investigation $71,730 <br />400 Cultural Resource Services $8,870 <br />500 Project Reports $22,570 <br />600 Engineering Design Services $469,010 <br />700 Final Design Services $122,280 <br />800 Bid Phase Support – Not Included $0 <br />900 Design Support during Construction – Not Included $0 <br />1000 Permitting $85,030 <br />Total Not to Exceed $877,460 <br />