Laserfiche WebLink
SUBCONSULTANTSCity of Everett:  Lexington‐Broadway SW Improvements Phase 1DEA (Survey) HWA GeotechnicalSUBCONSULTANTS5.00%200Task Total$13,800.00 $0.00$13,800.00 $690.00$14,490.00300Task Total$0.00 $63,413.00$63,413.00 $3,170.65$66,583.65Total Subconsultants 13,800.00$ 63,413.00$ 77,213.00$ 3,860.65$ 81,073.65$ Total SubconsultantsSub MarkupTotal Subconsultants + MarkupSurvey and Utility LocationGeotechnicalC:\CKinzer\01 Project\10356686 Lexington SW\00_Phase 1 Scoping\City Meetings\2024‐03‐29 Erik_Heather\Everett ‐ Lex‐Broadway SW Imp Ph1 Estimate_Final_2024.03.29.xlsm