My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sound Transit 5/1/2024
>
Contracts
>
Agreement
>
Interagency Agreements (not grant agreements)
>
Sound Transit 5/1/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 9:26:58 AM
Creation date
5/2/2024 9:26:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sound Transit
Approval Date
5/1/2024
Council Approval Date
1/31/2024
Department
Planning
Department Project Manager
Yorik Stevens-Wajda
Subject / Project Title
Everett Link Extension and Operations and Maintenance Facility North Project and Task Order 1
Tracking Number
0004325
Total Compensation
$830,000.00
Contract Type
Agreement
Contract Subtype
Interagency Agreements (not grant agreements)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br />GA 0043-23 Everett-ST PAA 4 <br /> <br /> <br />5.3 Task Order Development. Sound Transit will request that the City perform specific <br />work under this Agreement through written Task Orders. This Agreement applies <br />to Project work and eligible costs beginning after execution of this Agreement and <br />associated Task Order. Any prior Project-related work or costs incurred by the City <br />are the responsibility of the City. Task Orders will be prepared by Sound Transit, <br />reviewed by the City, and executed by the Parties for each work effort to be <br />covered by this Agreement. Task Orders will be in a format similar to that shown in <br />Exhibit B. Each Task Order will include a scope of work, a schedule of work, and a <br />detailed cost estimate that establishes a maximum funding level for the Task <br />Order. Each Task Order will be executed by the authorized designees of Sound <br />Transit and the City and will incorporate by reference the terms and conditions of <br />this Agreement. <br />5.4 Task Order Management. For each Task Order, the City will provide quarterly <br />progress reports to Sound Transit indicating the amount spent and estimated cost to <br />complete each scope and budget element included in the Task Order. If actual costs <br />are anticipated to exceed the amount of the Task Order, the Designated <br />Representatives (or designees) will prepare a mutually agreeable cost estimate to <br />complete the work and develop an appropriate course of action, which may include <br />amending the Task Order or executing a new Task Order. <br />5.5 Eligible Costs. <br />5.5.1 The following costs will be eligible for reimbursement: <br />i. Employees: (1) the applicable employees’ direct salaries; and (2) <br />associated direct and indirect costs as adopted in a City fee <br />schedule, provided that the fee schedule is reasonable and <br />consistent with subsection (b) of this section; charged on an hourly <br />basis at the rates in effect at the time the charges are incurred. <br />ii. Consultants. Direct costs incurred by the City to retain consultants to <br />work on the Project for otherwise reimbursable activities as set forth <br />in this Agreement. <br />5.5.2 Ineligible Costs. This Agreement does not cover City's normal capital and <br />operating expenses such as buildings, office equipment, maintenance, <br />security, utilities, or vehicles. <br />5.6 Performance. If the City does not perform the services described in the Task Orders, <br />and if the failure to perform is solely attributable to the City's actions or inactions, <br />appropriate corrective action will be discussed and agreed upon by the Designated
The URL can be used to link to this page
Your browser does not support the video tag.