My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 5/1/2024 Amendment 1
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction 5/1/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 9:31:01 AM
Creation date
5/2/2024 9:30:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
5/1/2024
Council Approval Date
5/10/2023
End Date
12/30/2024
Department
Transportation Services
Department Project Manager
Sabina Araya
Subject / Project Title
Inductive Charging Infrastructure for Eclipse Mill Park
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003790
Total Compensation
$103,534.59
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 6/12/2023
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />Change Order No.__1______________________ <br />Change Order Effective Date:_4/26/24______ <br /> <br /> <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. The amount of this Change Order for the changes described in Exhibit A, <br />represents complete compensation for the changes described in Exhibit A, <br />including all direct and indirect costs and impacts. The Contract Sum shall be <br />adjusted as described in this Change Order. <br />3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the Mayor or the Mayor’s designee is authorized to direct Contractor to perform additional work. In calculating such threshold amounts, Washington State sales tax, as applicable to the Work, has been considered. <br />4. The Contract Time of the Contract shall be adjusted to the extent described in this Change Order. <br />5. Contractor waives and releases any and all claims arising out of, or related to, this Change Order, the work described in Exhibit A, and all work and actual or constructive changes that occurred or began prior to the date of this Change Order, including, but not limited to, claims for equitable adjustment of time and compensation, delay, impact, overhead, or inefficiencies. This provision does not apply to requests for equitable adjustment of time or price for which the Contractor timely and properly provided notice of a differing site condition, protest, dispute, claim or Contract Claim as required by the Contract Documents. If the Contract Documents establish a time period for notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends after the date of this Change Order, but relates to work performed prior to the date of this Change Order, then this provision does not apply if the Contractor timely and properly submits such notice <br />6. This Change Order only changes the contract between Contractor and City to the extent explicitly provided herein. <br />7. Signature(s) on this Change Order may be by pdf, email, fax or other electronic <br />means, in which case such signature(s) will have the same effect as an original <br />ink signature. This Change Order may be signed in counterparts, each of <br />which shall be deemed an original, and all of which, taken together, shall be <br />deemed one and the same document.
The URL can be used to link to this page
Your browser does not support the video tag.