My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay PROPOSAL: BID ITEM TABLE PW# 3823 March 7, 2024 Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be typed or entered in ink. BID SCHEDULES, 2024 Pavement Maintenance Overlay WO# 3823 BIDDER:____________________________ Item No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT Base Bid - Schedule A A1 Mobilization LS 1 $_______.___ $______________.___ A2 Flaggers (Minimum Bid Prevailing Wage) Hour 4,147 $_______.___ $______________.___ A3 Uniformed Police Officer Hour 310 $_______.___ $______________.___ A4 Project Temporary Traffic Control LS 1 $_______.___ $______________.___ A5 Portable Changeable Message Sign Hour 1,828 $_______.___ $______________.___ A6 Planing Bituminous Pavement SY 73,177 $_______.___ $______________.___ A7 Additional Planing Bituminous Pavement SY 10,977 $_______.___ $______________.___ A8 HMA Class 1/2 Inch, PG 64-22 Ton 8,966 $_______.___ $______________.___ A9 Street Cleaning HR 180 $_______.___ $______________.___ A10 Adjust Manhole Each 42 $_______.___ $______________.___ A11 Adjust Catch Basin/Inlet to Grade Each 78 $_______.___ $______________.___ A12 Adjust Valve Box to Grade Each 55 $_______.___ $______________.___ A13 Adjust Existing Monument Castings to Grade Each 16 $_______.___ $______________.___ A14 Plastic Wide Line LF 35,638 $_______.___ $______________.___ A15 Plastic Line LF 46,428 $_______.___ $______________.___ A16 Plastic Traffic Arrow Each 46 $_______.___ $______________.___ A17 24” Plastic Crosswalk Line SF 3,320 $_______.___ $______________.___ A18 24” Plastic Stop Line LF 356 $_______.___ $______________.___ A19 Plastic Traffic Letter Each 26 $_______.___ $______________.___ A20 24” Plastic Green Bike Lane Extension Line SF 468 $_______.___ $______________.___ A21 Plastic Access Parking Space Symbol Each 1 $_______.___ $______________.___
The URL can be used to link to this page
Your browser does not support the video tag.