My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Local Agency Subcontractor List <br />Prepared in compliance with RCW 39.30.060 as amended <br />To Be Submitted with the Bid Proposal <br />Project Name <br />Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the <br />work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in <br />Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br />the same work will result in your bid being non-responsive and therefore void. <br />Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name. <br />To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is <br />listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be <br />performed by a lower tier subcontractor who will not contract directly with the bidder. <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />Subcontractor Name <br />Work to be performed <br />* Bidder’s are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc, are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project. <br />DOT Form 271-015A Revised 06/2020
The URL can be used to link to this page
Your browser does not support the video tag.