My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br /> ITEM DESCRIPTION YES NO <br />34. Cantilever Sign Structure - Cantilever Sign Structure <br />fabricated from steel tubing meeting AASHTO-M-183. See Std. <br /> Plans, and Contract Plans for details. The steel structure <br />shall be galvanized after fabrication in accordance with <br />AASHTO-M-111. <br />X <br />35. Mono-tube Sign Structures - Mono-tube Sign Bridge <br />fabricated to details shown in the Plans. Shop drawings for <br />approval are required prior to fabrication. X <br />36. Steel Sign Bridges - Steel Sign Bridges fabricated from steel <br />tubing meeting AASHTO-M-138 for Aluminum Alloys. <br />See Std. Plans, and Contract Plans for details. The steel <br />structure <br />shall be galvanized after fabrication in accordance <br />with AASHTO-M-111. <br />X <br />37. Steel Sign Post - Fabricated Steel Sign Posts as detailed in Std <br />Plans. Shop drawings for approval are to be provided prior to <br />fabrication <br />X <br />38. Light Standard-Prestressed - Spun, prestressed, hollow <br />concrete poles. X <br />39. Light Standards - Lighting Standards for use on highway <br />illumination systems, poles to be fabricated to conform with <br />methods and materials as specified on Std. Plans. See Specia <br />Provisions for pre-approved drawings. <br />X <br />40. Traffic Signal Standards - Traffic Signal Standards for use on <br />highway and/or street signal systems. Standards to be <br />fabricated <br />to conform with methods and material as specified on Std. <br />Plans. <br />See Special Provisions for pre-approved drawings <br />X <br />41. Precast Concrete Sloped Mountable Curb (Single and <br />DualFaced) <br />See Std. Plans. <br />X <br />Supplemental to Wage Rates <br />3/2/2024 Edition, Published February 1 <br />6
The URL can be used to link to this page
Your browser does not support the video tag.