My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 5 amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment 1 of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s 2 UDBE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor’s 3 Registration Number; and a Business License Number, if applicable. Bids shall be 4 completed by typing or shall be printed in ink by hand, preferably in black ink. The 5 required certifications are included as part of the Proposal Form. 6 7 The Contracting Agency reserves the right to arrange the proposal forms with alternates 8 and additives, if such be to the advantage of the Contracting Agency. The bidder shall 9 bid on all alternates and additives set forth in the Proposal Form unless otherwise 10 specified. 11 12 F1-02.6.OptionB Bid Additive.docx 13 (January 4, 2024 APWA GSP 1-02.6, Option B, COE) 14 15 Supplement the second paragraph with the following: 16 4. If a minimum bid amount has been established for any item, the unit or lump sum 17 price must equal or exceed the minimum amount stated. 18 5. Any correction to a bid made by interlineation, alteration, or erasure, shall be 19 initialed by the signer of the bid. 20 21 Delete the last two paragraphs, and replace them with the following: 22 23 The Bidder shall submit with their Bid a completed Contractor Certification Wage Law 24 Compliance form, provided by the Contracting Agency. Failure to return this certification 25 as part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for 26 Award. A Contractor Certification of Wage Law Compliance form is included in the 27 Proposal Forms. 28 29 The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. 30 31 A bid by a corporation shall be executed in the corporate name, by the president or a 32 vice president (or other corporate officer accompanied by evidence of authority to sign). 33 34 A bid by a partnership shall be executed in the partnership name, and signed by a 35 partner. A copy of the partnership agreement shall be submitted with the Bid Form if any 36 DBE requirements are to be satisfied through such an agreement. 37 38 A bid by a joint venture shall be executed in the joint venture name and signed by a 39 member of the joint venture. A copy of the joint venture agreement shall be submitted 40 with the Bid Form if any DBE requirements are to be satisfied through such an 41 agreement. 42 *** 43 Section 1-02.6 is supplemented with the following: 44 45 Additive Bids 46 47 This Bid Proposal is composed of the following parts: 48 1. Base Bid 49
The URL can be used to link to this page
Your browser does not support the video tag.