My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 34 1 (1). To pay liquidated damages in the amount of $1,000 per working day for 2 failure to splice, test, and make operational induction loops within 10 working 3 days after installation of the final mat of asphalt overlay over each induction 4 loop in accordance with Section 8-20.3(14)C in these Special Provisions. 5 6 (2). In addition to the liquidated damages in (1) above, to pay (according to the 7 following formula) liquidated damages for each working day beyond the 8 number of working days established for Physical Completion, and 9 10 (3). To authorize the Engineer to deduct these liquidated damages from any 11 money due or coming due to the Contractor. 12 13 Liquidated Damages Formula 14 15 LD=0.15C/T 16 17 Where: 18 19 LD = liquidated damages per working day (rounded to the nearest dollar) 20 C = original Contract amount 21 T = original time for Physical Completion 22 23 When the Contract Work has progressed to Substantial Completion as defined in the 24 Contract, the Engineer may determine the Contract Work is Substantially Complete. The 25 Engineer will notify the Contractor in writing of the Substantial Completion Date. For 26 overruns in Contract time occurring after the date so established, the formula for 27 liquidated damages shown above will not apply. For overruns in Contract time occurring 28 after the Substantial Completion Date, liquidated damages shall be assessed on the 29 basis of direct engineering and related costs assignable to the project until the actual 30 Physical Completion Date of all the Contract Work. The Contractor shall complete the 31 remaining Work as promptly as possible. Upon request by the Project Engineer, the 32 Contractor shall furnish a written schedule for completing the physical Work on the 33 Contract. 34 35 1-09.GR1 36 Measurement and Payment 37 38 1-09.6.RTF 39 1-09.6 Force Account 40 (December 30, 2022 APWA GSP) 41 42 Supplement this section with the following: 43 44 The Contracting Agency has estimated and included in the Proposal, dollar amounts for 45 all items to be paid per force account, only to provide a common proposal for Bidders. All 46 such dollar amounts are to become a part of Contractor's total bid. However, the 47 Contracting Agency does not warrant expressly or by implication, that the actual amount 48 of work will correspond with those estimates. Payment will be made on the basis of the 49 amount of work actually authorized by the Engineer. 50
The URL can be used to link to this page
Your browser does not support the video tag.