My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 5/3/2024
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Lakeside Industries, Inc. 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 8:35:52 AM
Creation date
5/3/2024 8:28:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
5/3/2024
Council Approval Date
5/8/2024
End Date
8/31/2024
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2024 Pavement Maintenance Overlay
Tracking Number
0004332
Total Compensation
$2,540,916.30
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2024 Pavement Maintenance Overlay SPECIAL PROVISIONS PW# 3823 51 1 Joint sealant shall be used for transverse joints in paving. 2 3 Cleaning: Ensure that cracks are thoroughly clean, dry and free of all loose and foreign 4 material when filling with crack sealant material. Use a hot compressed air lance to dry 5 and warm the pavement surfaces within the crack immediately prior to filling a crack with 6 the sealant material. Do not overheat pavement. Do not use direct flame dryers. Routing 7 cracks is not required. 8 9 Sand Slurry: For cracks that are to be filled with sand slurry, thoroughly mix the 10 components and pour the mixture into the cracks until full. Add additional CSS-1 cationic 11 emulsified asphalt to the sand slurry as needed for workability to ensure the mixture will 12 completely fill the cracks. Strike off the sand slurry flush with the existing pavement 13 surface and allow the mixture to cure. Top off cracks that were not completely filled with 14 additional sand slurry. Do not place the HMA overlay until the slurry has fully cured. 15 16 The sand slurry shall consist of approximately 20 percent CSS-1 emulsified asphalt, 17 approximately 2 percent portland cement, water (if required), and the remainder clean 18 Class 1 or 2 fine aggregate per section 9-03.1(2). The components shall be thoroughly 19 mixed and then poured into the cracks and joints until full. The following day, any cracks 20 or joints that are not completely filled shall be topped off with additional sand slurry. After 21 the sand slurry is placed, the filler shall be struck off flush with the existing pavement 22 surface and allowed to cure. The HMA overlay shall not be placed until the slurry has 23 fully cured. The requirements of Section 1-06 will not apply to the portland cement and 24 sand used in the sand slurry. 25 26 In areas where HMA will be placed, use sand slurry to fill the cracks. 27 28 In areas where HMA will not be placed, fill the cracks as follows: 29 30 1. Cracks ¼ inch to 1 inch in width - fill with hot poured sealant. 31 2. Cracks greater than 1 inch in width – fill with sand slurry. 32 33 Hot Poured Sealant: For cracks that are to be filled with hot poured sealant, apply the 34 material in accordance with these requirements and the manufacturer’s 35 recommendations. Furnish a Type 1 Working Drawing of the manufacturer’s product 36 information and recommendations to the Engineer prior to the start of work, including the 37 manufacturer’s recommended heating time and temperatures, allowable storage time 38 and temperatures after initial heating, allowable reheating criteria, and application 39 temperature range. Confine hot poured sealant material within the crack. Clean any 40 overflow of sealant from the pavement surface. If, in the opinion of the Engineer, the 41 Contractor’s method of sealing the cracks with hot poured sealant results in an excessive 42 amount of material on the pavement surface, stop and correct the operation to eliminate 43 the excess material. 44 45 5-04.3(4)A2 Crack Sealing Areas Prior to Paving 46 In areas where HMA will be placed, use sand slurry to fill the cracks. 47
The URL can be used to link to this page
Your browser does not support the video tag.