Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-94 <br />Sprint <br />2210 S 35th St <br />Tacoma, WA 98409 <br />Attn: Steven Schauer <br />Tel. (360) 402-4159 (Cell) <br />Email: steven.schauer@sprint.com <br />City of Everett, Traffic <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />Attn: Corey Hert <br />Tel. (425) 257-8800 <br />Email: CHert@everettwa.gov <br /> <br />Verizon <br />(425) 229-3123 <br />1-800-483-1000 (emergency) <br />AT&T <br />11241 Willows Road NE, Suite 130 <br />Redmond, WA 98052 <br />Attn: Steve Duppenthaler <br />AT&T Corp Long Distance Fiber Network <br />(425) 286-3822 <br />sd1891@att.com <br />Astound Broadband <br />4766 1st Ave S <br />Seattle, WA 98134 <br />Attn: Jim Biggs <br />(206) 786-8720 <br />jim.biggs@astound.com <br /> <br />Jeremy Anderson <br />jeremy.anderson@astound.com <br />Municipal Projects Contact: Kasy Kolling <br />(425) 754-6317 <br />kckolling@astoundbroadband.com <br />Construction Dept. General email: <br />wa-construction@wavebroadband.com <br /> <br /> <br />1-07.17(1) Utility Construction, Removal or Relocation by Contractor <br />Delete all three paragraphs of 1-07.17(1) and substitute the following: <br />If the Work requires removing or relocating a utility, utility owners or their <br />contractors will furnish all work necessary to adjust, relocate, replace, or construct <br />their facilities. <br />1-07.17(2) Utility Construction, Removal or Relocation by Others <br />Revise the first paragraph of 1-07.17(2) as follows: <br />Any authorized agent of the City or utility owners may enter the City right-of-way <br />or easement to repair, rearrange, alter, or connect their equipment. The <br />Contractor shall cooperate with such effort and shall avoid creating delays or <br />hindrances to those doing the Work. The Contractor shall arrange to coordinate <br />work schedules as needed. <br />1-07.17(3) Utility Potholing <br />Section 1-07.17(3) is added as follows: <br />The Contractor shall be responsible for coordination with the utility companies of <br />their facilities within the project limits. Contact information for the utilities is <br />included within these Contract Provisions and the Contractor is solely <br />responsible for making the appropriate contacts and giving the appropriate <br />notices. See also Section 1-05.14 of these Special Provisions. <br />Potholing is included as a bid item for use in determining the location of existing <br />utilities in advance of the Contractor’s operations. The Contractor shall submit all <br />potholing requests to the Engineer for approval, at least 5 working days before <br />potholing is scheduled. Additionally, the Contractor shall provide potholing at