My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-98 <br />Harbor Workers' Compensation Act as administered by the U.S. Department of <br />Labor. <br />If the Contractor is working from barges or any other watercraft, owned or non- <br />owned, the Contractor shall maintain Protection and Indemnity (P&I) insurance <br />providing coverage for actions of the crew to third parties to the same limits stated <br />under 1-07.18(5)A of this section for Commercial General Liability Insurance. The <br />Contractor shall also provide proof of insurance coverage in compliance with the <br />statutory requirements of the Merchant Marine Act of 1920 (the "Jones Act"). <br />1-07.18(5)E Excess or Umbrella Liability <br />The limits stated in this section 1-07.18 may be satisfied by a combination of <br />liability and, if necessary, commercial umbrella/excess policies. <br />1-07.18(5)F Pollution Liability <br />The Contractor shall provide a Pollution Liability policy, providing coverage for <br />claims involving bodily injury, property damage (including loss of use of tangible <br />property that has not been physically injured), cleanup costs, remediation, <br />disposal or other handling of pollutants, including costs and expenses incurred in <br />the investigation, defense, or settlement of claims arising out of: <br />Contractor’s operations related to this project; <br />Remediation, abatement, repair, maintenance or other work with lead-based paint <br />or materials containing asbestos; and <br />Transportation of hazardous materials away from any site related to this project. <br />Such Pollution Liability policy shall provide the following minimum coverage: <br />$2,000,000 each loss and annual aggregate <br />1-07.18(5)G Professional Liability <br />The Contractor, its Subcontractor and its design consultant providing construction <br />management, value engineering, or other design-related non-construction <br />professional services shall provide evidence of Professional Liability insurance <br />covering professional errors and omissions. Such policy shall provide the following <br />minimum limits: <br />$2,000,000 per Claim <br />If the scope of such design-related professional services includes work related to <br />pollution conditions, the Professional Liability insurance shall include Pollution <br />Liability coverage. <br />If insurance is on a claims made form, its retroactive date, and that of all <br />subsequent renewals, shall be no later than the effective date of this Contract. <br />1-07.18(5)H Builder’s Risk <br />If the Project includes construction of a structure, t he Contractor shall procure and <br />maintain during the life of the Contract, or until acceptance of the project by the <br />City, whichever is longer, “All Risk” Builders Risk or Installation Floater Insurance <br />at least as broad as ISO form number CP0020 (Builders Risk Coverage Form) <br />with ISO form number CP0030 (Causes of Loss – Special Form) including <br />coverage for collapse, theft, off-site storage and property in transit. The coverage <br />shall insure for direct physical loss to property of the entire construction project, <br />for 100% of the replacement value thereof and include earthquake. The policy <br />shall be endorsed to cover the interests, as they may appear, of the City, <br />Contractor and subcontractors of all tiers with the City and sub-contractors listed <br />as a Named Insured. In the event of a loss to any or all of the work and/or <br />materials therein and/or to be provided at any time prior to the final close -out of <br />the Contract and acceptance of the project by the City, the Contractor shall <br />promptly reconstruct, repair, replace or restore all work and/or materials so
The URL can be used to link to this page
Your browser does not support the video tag.