My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-100 <br />1-07.23(1)A General Requirements Traffic <br />(******) <br />The following general requirements apply to all Work on the Project: <br />Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br />10.2(2) TRAFFIC CONTROL PLANS. <br />Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br />construction constraints resulting from traffic control. <br />Notify all affected property owners prior to commencing the barricading of <br />streets, sidewalks and driveways. <br />All business driveways shall remain open except as necessary to permit <br />curing of construction materials or for short periods of time as required for <br />excavations. However, at least one driveway per business shall remain open <br />to vehicular traffic at all times unless otherwise approved by the Engineer and <br />affected property owner in writing. <br />Signs and barricades shall be supplemented by lanterns or flasher units <br />during the hours of darkness. <br />Drivers of motor vehicles used in connection with the construction shall obey <br />traffic rules posted for such location in the same manner and under the same <br />restrictions as provided for the drivers of private vehicles. <br />Conduct the Work, at all time throughout the project, in such a manner as will <br />obstruct and inconvenience vehicular and pedestrian traffic as little as <br />possible. Keep the streets, sidewalks and private driveways open except for <br />the brief periods when actual Work is being done. <br />No lane closures will be permitted between 3:30 p.m. and 6:00 p.m., unless <br />specifically approved by the Engineer. <br />1-07.24 Rights of Way <br />Delete1-07.24 and substitute the following: <br />Street right of way lines, limits of easements, and limits of construction permits are <br />indicated on the Plans. The Contractor’s construction activities shall be confined within <br />these limits, unless arrangements for use of private property are made. <br />Generally, the City will have obtained, prior to bid opening, all rights of way and <br />easements, both permanent and temporary, necessary for carrying out the Work. <br />Exceptions to this are noted on the Plans. <br />Whenever any of the Work is accomplished on or through property other than public <br />right of way, the Contractor shall meet and fulfill all covenants and stipulations of any <br />easement agreement obtained by the City from the owner of the private property. <br />Copies of the easement agreements may be included in the Contract Documents or <br />made available to the Contractor as soon as practical after they have been obtained by <br />the Engineer. <br />The Contractor shall not proceed with any portion of the Work in areas where right of <br />way, easements or rights of entry have not been acquired until the Engineer certifies to <br />the Contractor that the right of way or easement is available or that the right of entry <br />has been received. If the Contractor is delayed due to acts of omission on the part of <br />the City in obtaining easements, rights of entry or right of way, the Contractor will be <br />entitled to an extension of time. The Contractor agrees that Delay resulting from City <br />obtaining easement or right of entry or right of way shall not be a breach of Contract. <br />Each property owner shall be given 48 hours notice prior to entry by the Contractor. <br />This includes entry onto easements and private property where private improvements <br />must be adjusted.
The URL can be used to link to this page
Your browser does not support the video tag.