Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div P – PROPOSAL March 2024 <br />Work Order No. UP 3814 SP-3 <br /> <br />DIVISION P – PROPOSAL <br />CITY OF EVERETT, WASHINGTON <br />WATER MAIN REPLACEMENT “Y” – Phase 1 <br />WORK ORDER NO. UP 3814 <br /> <br /> <br />To the City Council <br />Everett, Washington <br /> <br /> <br />The undersigned Bidder declares that it has carefully examined the Notice to Contractors and the <br />Contract Documents (including without limitation Plans and Specifications, Standard Specifications, <br />Special Provisions, Appendix, Proposal, and Contract) for the construction of approximately 3,920 <br />linear feet of 6-inch to 12-inch ductile iron water main and other such Work as may be necessary, in <br />accordance with the Contract. The undersigned Bidder declares that the Bidder has made such <br />investigations as are necessary to determine the conditions to be encountered, and that, if this Proposal <br />is accepted, the undersigned will enter into a contract with the City of Everett, Washington, in the form <br />of Contract hereto annexed, the undersigned will, to the extent required, provide the necessary <br />equipment, tools, apparatus, and other means of construction, and the undersigned will furnish all labor <br />and materials necessary to complete the Work in the manner herein specified and according to the <br />requirements of the Engineer. <br /> <br />The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br />on the part of any person, firm or corporation mentioned below, and no officer or employee of the City <br />of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any <br />purchase of or sale of any materials or supplies for the Work to which it relates, or any portion of the <br />profits thereof. <br /> <br />The undersigned Bidder agrees that the undersigned will complete the Work in all respects as required <br />by Division C, Section 2. Contract Time and that the Bidder will pay liquidated damages to the City <br />in the amount specified in the Contract Documents. <br /> <br />Accompanying this Proposal is a bid bond or certified check or cashier’s check in the amount of five <br />percent (5%) of the Proposal according to the conditions of the “Notice to Contractors” and “Division <br />1 - General Requirements” hereby incorporated. If this Proposal shall be accepted by the City of <br />Everett, Washington, and the undersigned shall fail to execute a satisfactory contract and bond, as <br />stated in the Division 1 – General Requirements hereto incorporated, within 14 calendar days after the <br />Award Date, then the City may, at its option, determine that the undersigned has abandoned the <br />Contract and the amount of the bid bond or certified check or cashier’s check accompanying this <br />Proposal shall be forfeited and become the property of the City of Everett, Washington. <br />