Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-132 <br />b. Materials <br />c. Direct Equipment. The actual cost for each piece of equipment <br />for which a Contract Claim is made or in the absence of actual <br />cost, the rates established by the AGC/WSDOT Equipment <br />Rental Agreement that was in effect when the Work was <br />performed. In no case shall the amounts sought or paid for each <br />piece of equipment exceed the rates established by the <br />Equipment Rental Agreement even if the actual cost for such <br />equipment is higher. The City may audit the Contractor’s cost <br />records to determine actual equipment cost. The following <br />information shall be provided for each piece of equipment: <br />i. Detailed description (e.g., Motor Grader Diesel <br />Powered Caterpillar 12 “G”, Tractor Crawler ROPS & <br />Dozer Included Diesel, etc.) <br />ii. The hours of use or standby; and <br />iii. The specific day and dates of use or standby; <br />iv. Job overhead. <br />v. Overhead (general and administrative). <br />vi. Subcontractor’s Contract Claims (in the same level of <br />detail as specified herein is required for any <br />subcontractor’s Contract Claims); and <br />vii. Other categories as specified by the Contractor or the <br />City. <br />10. A notarized statement shall be submitted to the City's Representative <br />containing the following language: <br />Under the penalty of law for perjury or falsification, the undersigned, <br /> <br />________________________________, _____________________ <br /> (name) (title) <br />of <br />______________________________________________________ <br /> (company) <br />hereby certifies that the Contract Claim for an adjustment of the <br />Contract Sum and/or Contract Time, if any, made herein for Work on <br />this Contract is a true and complete statement of the factual basis of <br />the Contract Claim and all actual costs incurred and time sought, <br />and is fully documented and supported under the Contract between <br />the parties. <br />Date ______________/s/ __________________________________ <br />Subscribed and sworn before me this ____________ day of <br />_______ <br />Notary Public <br />My Commission Expires: __________________________________ <br /> <br />1-09.11(2)C False Or Omitted Information <br />The Contractor waives each Contract Claim for which it presents material <br />information that it knows, or in the exercise of reasonable care should know, is <br />false, or omits or fails to disclose material information relating to such Contract
The URL can be used to link to this page
Your browser does not support the video tag.