My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-136 <br />presenting any claim under this section of the Contract, the Contractor agrees to <br />provide to the City any and all financial data needed by the City, or its <br />representative, to review, substantiate and evaluate any claim for Extended or <br />Unabsorbed Home Office Overhead, or both. Failure to provide the requested <br />information shall constitute waiver by the Contractor. <br />If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or <br />Extended Overhead, it shall be calculated as provided in these Special Provisions. <br />1-09.11A(4)A1 Elements <br />Contractor shall only be entitled to an adjustment of Contract Sum for <br />Unabsorbed or Extended Overhead if it clearly and convincingly <br />demonstrates all of the following: <br />1. The City solely caused a Delay to the Completion Date as measured <br />by analysis of the project duration by the critical path method <br />pursuant to 1-08.3 PROGRESS SCHEDULE; <br />2. Because of the Delay described in subsection (1), the Contractor <br />was forced to suspend or significantly interrupt its performance so <br />that it was on standby or idled, and the City required the Contractor <br />to be ready to resume performance on short notice. Extended time <br />of performance of Work, such as extensions caused by changes, <br />inefficiencies, or extra Work, does not constitute suspension or <br />significant interruption of performance. <br />3. The Contractor could not and did not use resources, including, but <br />not limited to, labor, equipment, materials and tools, standing by or <br />idled on this or other project for any work during the period of Delay; <br />4. The Contractor’s Overhead costs did not materially vary from its <br />usual seasonal Overhead costs during the period of Delay; and <br />5. The Delay did not cause over absorbed Overhead in the period the <br />delayed Work was completed. <br />1-09.11A(4)A1a Resources <br />To demonstrate the Contractor could not and did not use resources, <br />including, but not limited to, labor, equipment, materials and tools from <br />this Project for any other work on this or any other project during the <br />period of Delay in accordance with item 3 of 1-09.11A(4)A1 of these <br />Special Provisions, the Contractor shall: <br />1. Affirmatively represent and warrant that it did not perform <br />substitute work; <br />2. Identify the specific resources that were idled; and <br />3. Show that those resources did not, and could not, work on other <br />contracts or projects during the Delay. <br />1-09.11A(4)A1b No Material Variations <br />To demonstrate the Contractor’s Overhead costs did not materially vary <br />from its usual seasonal Overhead costs during the period of Delay in <br />accordance with item 4 of 1-09.11A(4)A1 of these Special Provisions, the <br />Contractor shall; <br />1. Affirmatively represent and warrant that the completion of the <br />subject Work was extended and that such extension prevented <br />the performance of other work during both the period of Delay <br />and the later period of time required to complete the extended <br />Work,
The URL can be used to link to this page
Your browser does not support the video tag.