My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Earthworks Solutions, LLC 5/3/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Earthworks Solutions, LLC 5/3/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2024 1:19:59 PM
Creation date
5/3/2024 8:46:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Earthworks Solutions, LLC
Approval Date
5/3/2024
Council Approval Date
5/8/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "Y"
Tracking Number
0004333
Total Compensation
$3,300,935.68
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Water Main Replacement “Y” – Ph 1 Div 1 – GENERAL REQMTS March 2024 <br />Work Order No. UP 3814 SP-138 <br />1-09.12(2) Claims <br />All Contract Claims filed against the City shall be subject to audit at any time following <br />the filing of the Contract Claim. Failure of the Contractor, Subcontractors, or lower tier <br />subcontractors to maintain and retain sufficient records to allow the auditors to verify <br />all or a portion of the Contract Claim or to permit the auditor access to the books and <br />records of the Contractor, Subcontractors, or lower tier subcontractors shall constitute <br />a waiver of a Contract Claim and shall bar recovery in connection with the Contract. <br />1-09.12(3) Required Documents for Audits <br />An audit may be performed by employees of the City or a representative of the City. <br />The Contractor and its Subcontractors shall provide adequate facilities acceptable to <br />the City for the audit during normal business hours. The Contractor and all <br />Subcontractors shall cooperate with the City’s auditors. <br />As a minimum, the auditors shall have available to them the following documents: <br />1. Daily time sheets and supervisor’s daily reports. <br />2. Collective Bargaining Agreements. <br />3. Insurance, welfare, and benefit records. <br />4. Payroll registers. <br />5. Earnings records. <br />6. Payroll tax forms. <br />7. Material invoices and requisitions. <br />8. Material cost distribution worksheet. <br />9. Equipment records (list of company equipment, rates, etc.) <br />10. Vendors,’ rental agencies,’ Subcontractors’ and lower tier subcontractors’ <br />invoices. <br />11. Contracts between the Contractor and each of its Subcontractors, and all <br />lower tier subcontractor contracts and supplier contracts. <br />12. Subcontractors’ and lower tier subcontractors’ payment certificates. <br />13. Canceled checks, including payroll and vendors. <br />14. Job cost reports, including monthly totals. <br />15. Job payroll ledger. <br />16. General ledger. <br />17. Cash disbursements journal. <br />18. Financial statements for all years reflecting the operations on this Contract. In <br />addition, the City may require, if it deems appropriate, additional financial <br />statements for three years preceding execution of the Contract and three <br />years following Final Acceptance of the Contract. <br />19. Depreciation records on all company equipment whether these records are <br />maintained by the company involved, its accountant, or others. <br />20. If a source other than depreciation records is used to develop costs for the <br />Contractor’s internal purposes in establishing the actual cost of owning and <br />operating equipment, all such other source documents that support the <br />amount of damages as to each Contract Claim. <br />21. Worksheets or software used to prepare the Contract Claim establishing the <br />cost components for items of the Contract Claim including but not limited to <br />labor, benefits and insurance, materials, equipment, Subcontractors, all <br />documents that establish the time periods, individuals involved, the hours for <br />the individuals, and the rates for the individuals.
The URL can be used to link to this page
Your browser does not support the video tag.